STEP • 6
STEP • 7
05
= Drill Points using
screws provided as shown
= Drill Points using
screws provided as shown
x2
4.0 x 70mm
Per Floor Section
x3
x2
4.0 x 70mm
Per Floor Section
x3
x3
x3
4.0 x 70mm
4.0 x 70mm
Per Panel Edge
Per Panel Edge
© Sheds (Midlands) Limited 2021
www.totalsheds.co.uk
4FT WINDOW PANEL
2FT WINDOW
PANEL
4FT WINDOW
PANEL
4ft FRONT WINDOW
PANEL
Fix the First 4ft Window
Panel
7b.
2ft WINDOW PANEL
2ft WINDOW PANEL
Place the Window panel
againts far right of shed
floor as shown.
IMPORTANT
Start Build point from Left to Right of Shed
NOTE: Place panel to sit firmly on the
side Floor Block. See Diagram 5a
6a.
Place the 2ft Window panel as shown along the side of the shed floor aligning with the edge
of the side Floor Block.
6a
DID YOU KNOW?
Window and Door panels can be substituded
for a side panel of the same size.
7a.
Use the RED areas below as reference to
the joining points of the final panel. Note the
4ft section should fit perfectly to continue the
front section.
7b.
Place 4ft window panel as shown and fix in place
at the meeting points with screws. Fix the panel sides