P. 6
Bracket Position
Install the Bracket in a position 40-60mm
from the edge of the Head Rail and avoid the
resin parts. If there are three or more
Brackets, be sure to install them at intervals
that are as equally spaced as possible.
Installing the Brackets
Follow the illustrations for "Installation
Dimension" on p.5 and use the included
Fixing Screws to install the Brackets.
Even interval
Even interval
Bracket
4−6 cm
4−6 cm
Head Rail
Window
Indoor
Window
Indoor
Installing the Head Rail
Latch the temporary stopper hook onto the
Head Rail.
Push the Head Rail in until it clicks into place.
<For Front Attachment>
For Front Attachment, please use the Ceiling
Brackets in combination with the L-Shape
Brackets. There are two mounting holes on
the Ceiling Brackets. By using either hole, you
can adjust the protrusion width during
installation.
Fix the Ceiling Bracket
and L-Shape Bracket
with the included
screws.
Ceiling Bracket
L-Shape
Bracket
For Front Attachment
(There are three fixing screws for each bracket. )
For Ceiling Attachment
(There is one fixing screw for each bracket. )
L-Shape Bracket
P. 7
Caution
After installing the Head Rail, make sure the Head Rail is secured to the brackets.
Installing the Louver
Installing the Operation Wand
Latch the hook on the Operation Wand onto
the ring on the Head Rail.
If the installing height is 4010mm or higher,
the Operation Wand will be jointed. After
attaching the gripless Wand to the Head Rail,
latch the gripped Wand onto the joint.
Operate the Drive Cord to align the hooks on either side.
Align both sides simultaneously for the double-leaf type.
Simply reverse the illustration if you plan to install the cords on the left-hand side.
If the installing height is 3010mm or higher, the Operation Wand will be fixed on the operation
side.
Turn the Operation Wand to position the
hooks perpendicular to the Head Rail.
Louvers may not rotate properly unless they
are fitted with Roller Hooks in the
perpendicular position.
Hook
Operation Wand
Drive Cord
<Right–side alignment>
(Left side open)
<Left–side alignment>
(Right side open)
<Double-leaf>
(Center open)
Arrange the Louvers to be all face in the same direction and attach the matching part (i.e.,
hanger) of the louver mount to the corresponding Roller Hook.
Fold-back side
Roller Hook
Hanger section
Back
Front
<In the case of heat plate welding specification>