background image

P. 6

Bracket Position

Install the Bracket in a position 40-60mm 
from the edge of the Head Rail and avoid the 
resin parts. If there are three or more 
Brackets, be sure to install them at intervals 
that are as equally spaced as possible.

Installing the Brackets

Follow the illustrations for "Installation 
Dimension" on p.5 and use the included 
Fixing Screws to install the Brackets.

Even interval

Even interval

Bracket

4−6 cm

4−6 cm

Head Rail

Window

Indoor

Window

Indoor

Installing the Head Rail

Latch the temporary stopper hook onto the 
Head Rail.

Push the Head Rail in until it clicks into place.

<For Front Attachment>

 For Front Attachment, please use the Ceiling 

Brackets in combination with the L-Shape 
Brackets. There are two mounting holes on 
the Ceiling Brackets. By using either hole, you 
can adjust the protrusion width during 
installation.

Fix the Ceiling Bracket 
and L-Shape Bracket 
with the included 
screws.

Ceiling Bracket

L-Shape
Bracket

For Front Attachment

(There are three fixing screws for each bracket. )

For Ceiling Attachment

(There is one fixing screw for each bracket. )

L-Shape Bracket

P. 7

Caution

After installing the Head Rail, make sure the Head Rail is secured to the brackets.

Installing the Louver

Installing the Operation Wand

Latch the hook on the Operation Wand onto 
the ring on the Head Rail. 

 If the installing height is 4010mm or higher, 

the Operation Wand will be jointed. After 
attaching the gripless Wand to the Head Rail, 
latch the gripped Wand onto the joint.

Operate the Drive Cord to align the hooks on either side.
Align both sides simultaneously for the double-leaf type.

 Simply reverse the illustration if you plan to install the cords on the left-hand side.

 If the installing height is 3010mm or higher, the Operation Wand will be fixed on the operation 

side.

Turn the Operation Wand to position the 
hooks perpendicular to the Head Rail.

 Louvers may not rotate properly unless they 

are fitted with Roller Hooks in the 
perpendicular position.

Hook

Operation Wand

Drive Cord

<Right–side alignment>

(Left side open)

<Left–side alignment>

(Right side open)

<Double-leaf>

(Center open)

Arrange the Louvers to be all face in the same direction and attach the matching part (i.e.,
hanger) of the louver mount to the corresponding Roller Hook.

Fold-back side

Roller Hook

Hanger section

Back

Front

<In the case of heat plate welding specification>

Содержание DUAL 100

Страница 1: ...wn b Breakage or damage caused by transportation or due to dropping of the product after purchase c Misuse alterations to the product or usage of non genuine parts d Breakage or damage arising from external factors such as fires earthquakes lightening storms floods or other natural disasters e Exposure to unusual conditions excess moisture smoke chemical gases pollution f Breakage or damage due to...

Страница 2: ...ubject to high temperatures and high humidity or areas where water may leak should be avoided Make sure to install this product horizontally Precautions upon installing the product Please read before installation Warning Caution Caution Warning Japan Blind Industry Association P 3 Safety During Use Please read thoroughly Please keep the cord or the chain where children cannot reach Please avoid ac...

Страница 3: ...ents Product Weight 300 1200 1210 2400 2410 4000 2 3 4 2 6 3 9 4 12 1 Product Width mm Components Name Bracket Fixing Screw Safety Tassel Fixing Screw round head Ø3 5 x 20 Ceiling Bracket L Shape Bracket Screw for Front Attachment Bottom Cord 3 9kg Product Width 2 000 mm x Product Height 2 000 mm Product width W P 5 Installation and Detaching Installation Method Ceiling Attachment Front Attachment...

Страница 4: ...acket L Shape Bracket P 7 Caution After installing the Head Rail make sure the Head Rail is secured to the brackets Installing the Louver Installing the Operation Wand Latch the hook on the Operation Wand onto the ring on the Head Rail If the installing height is 4010mm or higher the Operation Wand will be jointed After attaching the gripless Wand to the Head Rail latch the gripped Wand onto the j...

Страница 5: ...tor so insert from above Balance Weight Bottom Cord P 9 Rotate the Operation Wand to confirm that the Louvers rotate properly The problem illustrated below is likely to have occurred if the Louvers fail to rotate properly Referring to Installing the Louver in step to on page 7 attach the Louver correctly Refit the Louvers so that they are correctly positioned Move slightly the hanger section to di...

Страница 6: ... Louver by turning the Operation Wand to reverse Adjusting the Louver angle Tilting Opening and Closing the Louver Drive Cord Operation Turn the Operation Wand to adjust Louver angle Turn the Operation Wand and adjust the Louver to be perpendicular to the Head Rail Pull down the Drive Cord until the Louver is in the position and release your hand Drive Cord operation is not available when the oper...

Страница 7: ...ckly the Louver slats will swing with great force and a gap may appear between the closing side and the Operation Wand being pulled on the opposite side If this occurs close the gap using the Operation Wand that was moved Operation Wand Operation Wand Indicates the product specifications P 13 Maintenance Sticker Your purchased product has an affixed maintenance sticker showing information related ...

Отзывы: