59
E. Auto Ketstone Alignment Procedure
Equipment:
Jig of
±
3 Procedure:
Set 0
°
angle of platform
Put the projector on it (already power on)
Send the Keystone Calibration 0 Command to projector
Command: STX K C 0 ETX
Check the keystone calibration 0 value after alignment
0
°
angle platform
Set +30
°
angle of platform
Send the Keystone Calibration 1 Command to projector
Command: STX K C 1 ETX
Check the keystone calibration 1 value after alignment
Set -30
°
angle of platform
Send the Keystone Calibration 2 Command to projector
Command: STX K C 2 ETX
Check the keystone calibration 2 value after alignment
After 5 ~ 10 minutes power on
Set 0
°
angle of platform
Send the Keystone Calibration 3 Command to projector
Command: STX K C 3 ETX
Check the keystone calibration 3 value after alignment
Send Save Factory & Lamp Data Command
Command: STX F S V ETX
F. PC and Component signal test
Equipment:
Pattern generator (Chroma 2250)
Pattern generator (VG828)
Procedure:
Change the input signal to source PC
Change the bellowing Timing and pattern of pattern generator:
Timing: 640x480@60Hz
00x600@60Hz
24x768@60Hz
1280x1024@60Hz
1600x1200@60Hz
Pattern: SMPTE RP-133
Содержание TDP-D1
Страница 8: ...7 Lamp box Input module ...
Страница 9: ...Chapter 2 Assy and Disassy drawing 8 ...
Страница 10: ...9 ...
Страница 11: ...10 ...
Страница 12: ...11 ...
Страница 13: ...12 ...
Страница 14: ...13 ...
Страница 15: ...14 ...
Страница 16: ...15 ...
Страница 23: ...22 3 Remove 2 cables 4 Lift the rear bezel ...
Страница 27: ...26 9 Remove 4 screws 10 Saparate the Input board from the PC board interface ...
Страница 29: ...28 2 Lift the upper power board 3 Remove 2 cables 4 Remove 4 screws for ballast ...
Страница 41: ...40 Chapter 5 Trouble shooting guide ...
Страница 42: ...41 ...
Страница 47: ...46 4 Power Supply Trouble Shooting Guide PFC BOARD DX850 DC DC BOARD ...
Страница 48: ...47 5 DMD Block Trouble Shooting Guide ...
Страница 49: ...48 ...
Страница 50: ...49 ...
Страница 52: ...51 Step 4 Setting COM Port Baud Rate ...
Страница 54: ...53 Step 6 Start download firmware ...
Страница 55: ...54 Step 7 Download finished Step 8 Turn off the power switch ...
Страница 110: ...109 Figure 1 Major Blemish Two Zone Screen Non Critical Zone Critical Zone center 25 ...
Страница 111: ...1 1 SHIBAURA 1 CHOME MINATO KU TOKYO 105 8001 JAPAN ...