IF08CZ10 April, 2019
- 2 -
INITIAL COMMISSIONING
The drive should be commissioned by qualified personnel only. Below are some general steps
required for commissioning.
Confirmation of Wiring
Make the following final checks before applying power to the unit:
1) Confirm that source power is connected to terminals L1, L2, L3 (R, S, T).
Connection of
incoming source power to any other terminals will damage the drive. Other control voltages
may be required. Consult your custom equipment diagrams shipped with the drive for any
other requirements.
2) Verify that the power modules are properly installed and that there was no damage during
shipping or handling.
3) Verify that there are no loose connections or wires and that all of the required shipping split
connections have been made.
4) Verify all external control circuit wiring is complete and properly connected.
5) The 3-phase source power should be within the correct voltage and frequency tolerances.
6) The motor leads must be connected to terminals T1, T2, T3 (U, V, W).
7) Make sure there are no short circuits or inadvertent grounds and tighten any loose connector
terminal screws.
Start-Up and Test
Prior to releasing the drive system for regular operation after installation, the system must
be adjusted and tested by qualified personnel.
This assures correct operation, of the equipment, for
reasons with reliability and safety performance. It is important to make arrangements for such a check and
that sufficient time is allowed for it.
CAUTION
CAUTION
CAUTION
Содержание T300MTX
Страница 19: ...IF08CZ10 April 2019 xix This page intentionally left blank ...
Страница 61: ...IF08CZ10 April 2019 39 CIRCUIT OPERATION cont d 4160V configuration Non regen 4160V configuration Regen ...
Страница 62: ...IF08CZ10 April 2019 40 CIRCUIT OPERATION cont d 6600V configuration ...
Страница 78: ...IF08CZ10 April 2019 56 DRIVE INSTALLATION DRAWINGS Frame 0 drive lifting and assembly ...
Страница 97: ...IF08CZ10 April 2019 75 DRIVE INSTALLATION DRAWINGS cont d Frame G4P drive lifting and assembly ...
Страница 98: ...IF08CZ10 April 2019 76 DRIVE INSTALLATION DRAWINGS cont d Frame G4P drive main cable installation ...
Страница 99: ...IF08CZ10 April 2019 77 DRIVE INSTALLATION DRAWINGS cont d Frame G4P module lifting and installation D C B A ...
Страница 101: ...IF08CZ10 April 2019 79 DRIVE INSTALLATION DRAWINGS cont d Frame H4P drive lifting and assembly ...
Страница 102: ...IF08CZ10 April 2019 80 DRIVE INSTALLATION DRAWINGS cont d Frame H4P drive main cable installation ...
Страница 103: ...IF08CZ10 April 2019 81 DRIVE INSTALLATION DRAWINGS cont d Frame H4P module lifting and installation ...
Страница 106: ...IF08CZ10 April 2019 84 DRIVE INSTALLATION DRAWINGS cont d Frame A2 drive lifting and assembly ...
Страница 109: ...IF08CZ10 April 2019 87 DRIVE INSTALLATION DRAWINGS cont d Frame B2 drive lifting and assembly ...
Страница 111: ...IF08CZ10 April 2019 89 DRIVE INSTALLATION DRAWINGS cont d Frame D2 drive lifting and assembly ...
Страница 112: ...IF08CZ10 April 2019 90 DRIVE INSTALLATION DRAWINGS cont d Frame D2 drive main terminal locations ...
Страница 114: ...IF08CZ10 April 2019 92 DRIVE INSTALLATION DRAWINGS cont d Frame A4µ drive lifting and assembly ...
Страница 116: ...IF08CZ10 April 2019 94 DRIVE INSTALLATION DRAWINGS cont d Frame A4 drive lifting and assembly ...
Страница 118: ...IF08CZ10 April 2019 96 DRIVE INSTALLATION DRAWINGS cont d Frame B4 drive lifting and installation ...
Страница 120: ...IF08CZ10 April 2019 98 DRIVE INSTALLATION DRAWINGS cont d Frame B6S drive lifting and assembly ...
Страница 121: ...IF08CZ10 April 2019 99 DRIVE INSTALLATION DRAWINGS cont d Frame B6S drive main terminal locations ...
Страница 123: ...IF08CZ10 April 2019 101 DRIVE INSTALLATION DRAWINGS cont d Frame C6S drive lifting and assembly ...
Страница 124: ...IF08CZ10 April 2019 102 DRIVE INSTALLATION DRAWINGS cont d Frame C6S drive main terminal locations ...
Страница 125: ...IF08CZ10 April 2019 103 DRIVE INSTALLATION DRAWINGS cont d Frame D6S module lifting and installation ...
Страница 126: ...IF08CZ10 April 2019 104 DRIVE INSTALLATION DRAWINGS cont d Frame D6S drive lifting and assembly ...
Страница 127: ...IF08CZ10 April 2019 105 DRIVE INSTALLATION DRAWINGS cont d Frame D6S drive main terminal locations ...
Страница 128: ...IF08CZ10 April 2019 106 DRIVE INSTALLATION DRAWINGS cont d Frame F6S F6S module lifting and installation ...
Страница 129: ...IF08CZ10 April 2019 107 DRIVE INSTALLATION DRAWINGS cont d Frame F6S drive lifting and assembly ...
Страница 130: ...IF08CZ10 April 2019 108 DRIVE INSTALLATION DRAWINGS cont d Frame F6S drive lifting and assembly ...
Страница 131: ...IF08CZ10 April 2019 109 DRIVE INSTALLATION DRAWINGS cont d Frame F6S F6S drive main terminal locations ...
Страница 132: ...IF08CZ10 April 2019 110 DRIVE INSTALLATION DRAWINGS cont d Frame MTX 15 drive lifting and assembly ...
Страница 133: ...IF08CZ10 April 2019 111 DRIVE INSTALLATION DRAWINGS cont d Frame MTX 30 drive lifting and assembly ...
Страница 135: ...IF08CZ10 April 2019 113 DRIVE INSTALLATION DRAWINGS cont d Frame MTX2 15 drive lifting and assembly ...
Страница 137: ...IF08CZ10 April 2019 115 DRIVE INSTALLATION DRAWINGS cont d Frame A4R drive lifting and assembly ...
Страница 139: ...IF08CZ10 April 2019 117 DRIVE INSTALLATION DRAWINGS cont d Frame B4R drive lifting and assembly ...