IF08CZ10 April, 2019
- xv -
Protection
•
Ensure that primary protection exists for the input wiring to the equipment. This protection must be
able to interrupt the available fault current from the power line. The equipment may or may not be
equipped with an input disconnect (option).
When sizing and installing the upstream cabling and protection equipment:
-
Consult the Manufacturer’s Nameplate for Equipment Voltage and Current
Requirements.
-
The equipment must be installed to meet the National Electrical Code rules of the
country where installed as a branch circuit protector.
-
The equipment must bear a safety mark accepted by the country where installed.
-
The equipment must be installed by a qualified electrician.
•
All cable entry openings must be sealed to reduce the risk of entry, by vermin, and to allow for
maximum cooling efficiency.
•
Follow all warnings and precautions, and do not exceed equipment ratings.
•
If using multiple motors, provide separate overload protection, for each motor, and use V/f control.
•
External dynamic braking resistors, if supplied, must be thermally protected.
•
It is the responsibility of the person installing the ASD or the electrical maintenance personnel to
setup the
Emergency Off
braking system of the ASD. The function of the
Emergency Off
braking
function is to remove output power, from the drive, in the event of an emergency. A supplemental
braking system may also be engaged in the event of an emergency.
Note
: A supplemental emergency stopping system should be used with the ASD.
Emergency stopping should not be a task of the ASD alone.
System Integration Precautions
The following precautions are provided as general guidelines for the setup of the ASD within the
system.
•
The Toshiba ASD is a general-purpose product. It is a system component only and the system
design should take this into consideration. Please contact Toshiba for application-specific
information and for training support.
•
The Toshiba ASD is part of a larger system and the safe operation of the device will depend on
observing certain precautions and performing proper system integration.
•
A detailed system analysis and job safety analysis should be performed by the systems designer
and/or systems integrator, before the installation of the ASD component. Contact Toshiba for
options availability and for application-specific system integration information, if required.
Содержание T300MTX
Страница 19: ...IF08CZ10 April 2019 xix This page intentionally left blank ...
Страница 61: ...IF08CZ10 April 2019 39 CIRCUIT OPERATION cont d 4160V configuration Non regen 4160V configuration Regen ...
Страница 62: ...IF08CZ10 April 2019 40 CIRCUIT OPERATION cont d 6600V configuration ...
Страница 78: ...IF08CZ10 April 2019 56 DRIVE INSTALLATION DRAWINGS Frame 0 drive lifting and assembly ...
Страница 97: ...IF08CZ10 April 2019 75 DRIVE INSTALLATION DRAWINGS cont d Frame G4P drive lifting and assembly ...
Страница 98: ...IF08CZ10 April 2019 76 DRIVE INSTALLATION DRAWINGS cont d Frame G4P drive main cable installation ...
Страница 99: ...IF08CZ10 April 2019 77 DRIVE INSTALLATION DRAWINGS cont d Frame G4P module lifting and installation D C B A ...
Страница 101: ...IF08CZ10 April 2019 79 DRIVE INSTALLATION DRAWINGS cont d Frame H4P drive lifting and assembly ...
Страница 102: ...IF08CZ10 April 2019 80 DRIVE INSTALLATION DRAWINGS cont d Frame H4P drive main cable installation ...
Страница 103: ...IF08CZ10 April 2019 81 DRIVE INSTALLATION DRAWINGS cont d Frame H4P module lifting and installation ...
Страница 106: ...IF08CZ10 April 2019 84 DRIVE INSTALLATION DRAWINGS cont d Frame A2 drive lifting and assembly ...
Страница 109: ...IF08CZ10 April 2019 87 DRIVE INSTALLATION DRAWINGS cont d Frame B2 drive lifting and assembly ...
Страница 111: ...IF08CZ10 April 2019 89 DRIVE INSTALLATION DRAWINGS cont d Frame D2 drive lifting and assembly ...
Страница 112: ...IF08CZ10 April 2019 90 DRIVE INSTALLATION DRAWINGS cont d Frame D2 drive main terminal locations ...
Страница 114: ...IF08CZ10 April 2019 92 DRIVE INSTALLATION DRAWINGS cont d Frame A4µ drive lifting and assembly ...
Страница 116: ...IF08CZ10 April 2019 94 DRIVE INSTALLATION DRAWINGS cont d Frame A4 drive lifting and assembly ...
Страница 118: ...IF08CZ10 April 2019 96 DRIVE INSTALLATION DRAWINGS cont d Frame B4 drive lifting and installation ...
Страница 120: ...IF08CZ10 April 2019 98 DRIVE INSTALLATION DRAWINGS cont d Frame B6S drive lifting and assembly ...
Страница 121: ...IF08CZ10 April 2019 99 DRIVE INSTALLATION DRAWINGS cont d Frame B6S drive main terminal locations ...
Страница 123: ...IF08CZ10 April 2019 101 DRIVE INSTALLATION DRAWINGS cont d Frame C6S drive lifting and assembly ...
Страница 124: ...IF08CZ10 April 2019 102 DRIVE INSTALLATION DRAWINGS cont d Frame C6S drive main terminal locations ...
Страница 125: ...IF08CZ10 April 2019 103 DRIVE INSTALLATION DRAWINGS cont d Frame D6S module lifting and installation ...
Страница 126: ...IF08CZ10 April 2019 104 DRIVE INSTALLATION DRAWINGS cont d Frame D6S drive lifting and assembly ...
Страница 127: ...IF08CZ10 April 2019 105 DRIVE INSTALLATION DRAWINGS cont d Frame D6S drive main terminal locations ...
Страница 128: ...IF08CZ10 April 2019 106 DRIVE INSTALLATION DRAWINGS cont d Frame F6S F6S module lifting and installation ...
Страница 129: ...IF08CZ10 April 2019 107 DRIVE INSTALLATION DRAWINGS cont d Frame F6S drive lifting and assembly ...
Страница 130: ...IF08CZ10 April 2019 108 DRIVE INSTALLATION DRAWINGS cont d Frame F6S drive lifting and assembly ...
Страница 131: ...IF08CZ10 April 2019 109 DRIVE INSTALLATION DRAWINGS cont d Frame F6S F6S drive main terminal locations ...
Страница 132: ...IF08CZ10 April 2019 110 DRIVE INSTALLATION DRAWINGS cont d Frame MTX 15 drive lifting and assembly ...
Страница 133: ...IF08CZ10 April 2019 111 DRIVE INSTALLATION DRAWINGS cont d Frame MTX 30 drive lifting and assembly ...
Страница 135: ...IF08CZ10 April 2019 113 DRIVE INSTALLATION DRAWINGS cont d Frame MTX2 15 drive lifting and assembly ...
Страница 137: ...IF08CZ10 April 2019 115 DRIVE INSTALLATION DRAWINGS cont d Frame A4R drive lifting and assembly ...
Страница 139: ...IF08CZ10 April 2019 117 DRIVE INSTALLATION DRAWINGS cont d Frame B4R drive lifting and assembly ...