No.
Part name
Procedures
Remarks
Heat exchanger
(Evaporator)
1) Follow the procedure item
③
.
2) Remove TA sensor, cover drain, TC/TCJ sensor
and earth line from the heat exchanger.
3) Remove 3 fixing screws at the left side of the heat
exchanger.
4) Remove 2 fixing screws at the upper and the bottom
right side of the heat exchanger.
Screws
Screws
Earth line
TC sensor
TCJ sensor
(For multiple model)
Cover drain
TA sensor
Top side
Right side
11
- 123 -