−
41
−
1 2 3
4
1 2 3
4
<How to connect the connecting cable>
Wiring of the connecting cable can be carried out
without removing the front panel.
1.
Remove the air inlet grille.
Open the air inlet grille upward and pull it toward
you.
2.
Remove the terminal cover and cord clamp.
3.
Insert the connecting cable (according to the local
cords) into the pipe hole on the wall.
4.
Take out the connecting cable through the cable
slot on the rear panel so that it protrudes about
15 cm from the front.
5.
Insert the connecting cable fully into the terminal
block and secure it tightly with screws.
6. Tightening torque : 1.2 N·m (0.12 kgf·m)
7.
Secure the connecting cable with the cord clamp.
8.
Fix the terminal cover, rear plate bushing and air
inlet grille on the indoor unit.
CAUTION
•
Be sure to refer to the wiring system diagram
labeled inside the front panel.
•
Check local electrical cords and also any specific
wiring instructions or limitations.
For
Heat pump model
Fig. 8-4-
5
Stripping length of the connecting cable
Fig. 8-4-
6
Earth line
Connecting
cable
Terminal
cover
Screw
Cord clamp
Terminal block
about 15 cm
Screw
Screw
Earth line
Connecting cable
For
Cooling model
Fig. 8-4-
7
Stripping length of the connecting cable
Fig. 8-4-
8
NOTE
•
Use stranded wire only.
•
Wire type : H07 RN-F or more
<How to install the air inlet grille on the indoor unit>
•
When attaching the air inlet grille, the contrary of
the removed operation is performed.
Fig. 8-4-
9
Earth line
1 2
1 2
Connecting
cable
Terminal
cover
Screw
Cord clamp
Terminal block
about 15 cm
Screw
Screw
Earth line
Connecting cable
60 mm
10 mm
10 mm
50 mm
80 mm
10 mm
10 mm
10 mm
70 mm
50 mm
FILE NO. SVM-06001