Page 38
OPERATION
CONTACTOR
INSTALLATION
T o i n s t a l l t h e c o n t a c t o r c a r r i a g e i n t h e
controller:
Lift and pull the release lever out all the
way, then pull out the service drawer
(Fig. 46).
To avoid tipping over,
the controller enclosure
must be securely bolted
to the floor.
Lift and place the contactor carriage on
the service drawer (Fig. 47). The front
of the carriage should line up with the
f r o n t o f t h e d r a w e r , a n d t h e f o u r
locator pins on top of the drawer
should engage the holes in the bottom
o f t h e c a r r i a g e .
Installation
of
contactor
carriages
in
the
upper
compartments of two- and three-high
stacking arrangements require the use
of a Toshiba JK lifting device.
Manually
lifting
heavy
equipment
c a n
cause
serious injury.
Use a
Toshiba JK lifting device.
With the carriage properly in place on
the service drawer, push the drawer
f i r m l y
all
t h e
i n t o
t h e
compartment.
Then push the release
lever in until it drops slightly and
latches. This operation causes the load
receptacle to apply bolted pressure to
the load stabs of the carriage.
Fig. 46 Release Lever Disengaged
Fig. 47 Placing The Contactor On The Service Drawer