H9 ASD Installation and Operation Manual
27
Startup and Test
Before turning on the ASD ensure that:
• R/L1, S/L2, and T/L3 are connected to the 3-phase input power.
• U/T1, V/T2, and W/T3 are connected to the motor.
• The 3-phase input voltage is within the specified tolerance.
• There are no shorts and all grounds are secured.
• All personnel are at a safe distance from the motor and the motor-driven equipment.
Содержание H9
Страница 1: ...H9 ADJUSTABLE SPEED DRIVE Installation and Operation Manual ...
Страница 2: ......
Страница 267: ...H9 ASD Installation and Operation Manual 259 Figure 34 See Tables 16 and 17 for actual dimensions ...
Страница 270: ...262 H9 ASD Installation and Operation Manual Figure 37 See Table 17 for the associated device Dimensions are in in cm ...