![Toshiba GX7R ASD Скачать руководство пользователя страница 35](http://html.mh-extra.com/html/toshiba/gx7r-asd/gx7r-asd_quick-start-manual_425663035.webp)
GX7R ASD Quick Start Guide
27
Pre-Startup and Test
Perform the following checks before turning on the unit:
•
L1/R
,
L2/S
, and
L3/T
are connected to the 3-phase input power sequenced as
C
-
B
-
A
, respectively.
•
T1
,
T2
, and
T3
are connected to the motor.
• The 3-phase input voltage is within the specified tolerance.
• There are no shorts and all grounds are secured.
• Front door is closed and all enclosure panels are securely fastened.
• All personnel are clear of the area of the installation and the driven equipment.
• Start up the unit as described in the section titled
.
Save User Settings
Use the following table to record any changed parameters for future reference.
Table 7. ASD Parameter Changes by Installer/Maintenance Personnel.
ASD ID__________Name:______________________Date:________
Notes
Parameter
Number
Parameter Name
Default or
Previous
Setting
New Setting
Unit of
Measure
Note:
Settings may also be recorded via Program
Utilities
Type Reset
Save User Parameters.
Содержание GX7R ASD
Страница 1: ...GX7R ASD Quick Start Guide TOSHIBA GX7R ASD Quick Start Guide DN 68986 002 September 2014 ...
Страница 2: ...GX7R ASD Quick Start Guide DN 68986 002 September 2014 ...
Страница 76: ...68 GX7R ASD Quick Start Guide Figure 23 480 Volt 30 100 HP GX7R ASD ...
Страница 77: ...GX7R ASD Quick Start Guide 69 Figure 24 480 Volt 125 150 HP GX7R ASD ...