© 2006 - 2008 TOSHIBA TEC CORPORATION All rights reserved
e-STUDIO165/167/205/207/237
ADJUSTMENT
3 - 37
3
[D] Connection for transfer/separation charger adjustment
Fig. 3-21
Front cover opening/closing switch
Ground to the
machine frame
(green cable)
(-) terminal:
Connect with the white cable
(+) terminal:
Connect with the
red cable (thin line)
Содержание e-STUDIO165
Страница 8: ...e STUDIO165 167 205 207 237 2006 2008 TOSHIBA TEC CORPORATION All rights reserved CONTENTS 4 ...
Страница 10: ......
Страница 200: ...e STUDIO165 167 205 207 237 2006 2008 TOSHIBA TEC CORPORATION All rights reserved ADJUSTMENT 3 62 ...
Страница 300: ...e STUDIO165 167 205 207 237 2006 2008 TOSHIBA TEC CORPORATION All rights reserved POWER SUPPLY UNIT 7 4 ...
Страница 308: ...e STUDIO165 167 205 207 237 2006 2008 TOSHIBA TEC CORPORATION All rights reserved WIRE HARNESS CONNECTION 9 2 ...
Страница 312: ......
Страница 313: ......