e-STUDIO163/166/203/206
© 2005 - 2008 TOSHIBA TEC CORPORATION All rights reserved
ADJUSTMENT
3 - 32
[A] Installation of the high-voltage transformer jig
(1)
Open the bypass tray, ADU and transfer
cover.
(2)
Open the front cover and take off the toner
cartridge.
(3)
Disconnect 1 connector. Loosen 2 screws
and pull out the process unit.
Note:
Note:
Be careful not to let the connector and the
harness be caught when installing the pro-
cess unit after adjustment.
Fig. 3-15
(4)
Install the high-voltage transformer jig and fix
it with 2 screws.
Note:
Note:
Be careful not to let the connector and the
harness be caught.
Fig. 3-16
(5)
Fix the green cable of the high-voltage trans-
former jig to the frame of the equipment.
Fig. 3-17
Connector
Process unit
High-voltage transformer jig
Green cable
Screw
Содержание e-STUDIO 163
Страница 6: ......
Страница 10: ...e STUDIO163 166 203 206 2005 2008 TOSHIBA TEC CORPORATION All rights reserved CONTENTS 4 ...
Страница 12: ......
Страница 140: ...e STUDIO163 166 203 206 2005 2008 TOSHIBA TEC CORPORATION All rights reserved ADJUSTMENT 3 58 ...
Страница 158: ...e STUDIO163 166 203 206 2005 2008 TOSHIBA TEC CORPORATION All rights reserved PREVENTIVE MAINTENANCE PM 4 18 ...
Страница 206: ...e STUDIO163 166 203 206 2005 2008 TOSHIBA TEC CORPORATION All rights reserved TROUBLESHOOTING 5 48 ...
Страница 228: ...e STUDIO163 166 203 206 2005 2008 TOSHIBA TEC CORPORATION All rights reserved POWER SUPPLY UNIT 7 4 ...
Страница 230: ...e STUDIO163 166 203 206 2005 2008 TOSHIBA TEC CORPORATION All rights reserved WIRE HARNESS CONNECTION 8 2 ...
Страница 234: ......
Страница 235: ......