50
180
3
190
150
170
160
6
130
140
120
90
110
100
40
30
10
70
60
20
80
1
2
4
5
7
200
LOOSEN AND REMOVE
BOLTS, WASHERS AND
NUTS.
NOTE:
ASSEMBLE ONE SIDE
AT A TIME
3
4
5
1
2
RE-USE BOLTS,
WASHERS AND
NUTS FROM
PREVIOUS STEP
19
20
4
3
5
1
17
STEP 9A & 9B (OPTIONAL UPPER BAND PEG
ATTACHMENT)
NOTE:
SECURELY
tighten all bolt connections in this step.