67
DE
EN
appropriate connection diagram for your system in the Service Center at www.
torqeedo.com
Wiring and connection of the system components are done in a specific order.
Follow the sequence to wire the system safely and correctly.
1.
Data cable
2.
Power cable
3.
Earth cable
4.
Charger unit (optional)
5.
Insulation monitor (optional)
6.
Land connection (optional)
Observe the minimum bending radius when laying all cables:
Torqeedo data cable
8 x diameter
Torqeedo power cable
8 x diameter
Earth cable
see cable manufacturer's specifica-
tions
Other power cables
see cable manufacturer's specifica-
tions
Data cable/network cable
1.
Lay the data cables according to your plans and fasten them in the desig-
nated places, making sure that you lay and fasten data cables and network
cables separately from power cables.
2.
Note the minimum bending radius.
3.
Make sure that the cables are laid without tension or load.
NOTE!
Possible damage to components. The connector plugs of the TorqLink data
cables must not be connected by force or with great effort.
TIP!
The plug turns several turns in the thread before it becomes tight. If the
plug becomes tight after the first 1 to 2 turns, stop turning immediately to avoid
damage to the plug or component. Unplug the plug and start again from the
beginning.
NOTE!
Always connect the data cables to the battery last.
4.
Position the connector plugs on the corresponding port of the component,
making sure that the nose of the plug slides into the groove of the compo-
nent.
5.
Screw the connection plug hand-tight.
6.
Connect all the data network connectors.
7.
Roll up the excess cable and secure it. (e.g. with cable ties).
Power cable
1.
Lay the system power cables.
2.
Attach the power cables to the designated places according to your plans.
3.
Note the minimum bending radius.
4.
Make sure that the cables are laid without tension or load.
5.
Make sure that the battery main switch is in the "OFF" position and secured
against being switched on again by pulling off the switch handle.
6.
Connect the red positive power cable to the positive terminal of the battery,
observing the tightening torque - see connection diagram.
7.
Connect the black negative power cable to the negative terminal of the
battery, observing the tightening torque - see connection diagram.
8.
Connect the plug connection of the power cables and fix them in the desig-
nated place according to your plans.
NOTE!
Observe the sequence when disconnecting the power cables, e.g. if you
want to disconnect for storage, see chapter “Storage”.
NOTE!
Power cables must not be coiled.
Earth cable
NOTE:
If a second earthed on-board power system is available, make sure that
both systems use a common earthing point, see connection diagram.