Testing the Engine Speed Control (continued)
B. Measure the resistance between the terminals A and C and then measure
the resistance between the terminals A and B. Record these resistances.
The total of the 2 measured resistances should be approximately 10,000
ohms.
C. Rotate the speed control knob and repeat step
5. Replace the speed control if necessary.
6. If the speed control tests correctly and a circuit problem still exists, check the
wire harness; refer to
Appendix A (page A–1)
.
7. Install the speed control and connect the wire harness after testing.
8. Connect the battery negative (-) cable at the battery.
Pro Force® Debris Blower
Page 5–23
Electrical System: Testing the Electrical Components
18237SL Rev A
Содержание Pro Force 44552
Страница 4: ...Reader Comments Page 4 Pro Force Debris Blower 18237SL Rev A ...
Страница 8: ...Preface Page 8 Pro Force Debris Blower 18237SL Rev A ...
Страница 28: ...Specifications and Maintenance Special Tools Page 2 14 Pro Force Debris Blower 18237SL Rev A ...
Страница 54: ...Engine Service and Repairs Page 4 16 Pro Force Debris Blower 18237SL Rev A ...
Страница 98: ...Electrical System Service and Repairs Page 5 44 Pro Force Debris Blower 18237SL Rev A ...
Страница 129: ...Pro Force Blower Drawing Rev Sheet 1 of 1 18237SL Rev A Page A 5 Engine Electrical Diagram g279585 ...
Страница 130: ...Page A 6 18237SL Rev A Pro Force Blower Drawing 122 1505 Rev A Sheet 1 of 1 Wire Harness Drawing Main g279710 ...
Страница 131: ...ProForce Blower Drawing 122 1505 Rev A Sheet 1 of 1 18237SL Rev A Page A 7 Wire Harness Diagram Main g279709 ...