![background image](http://html1.mh-extra.com/html/toro/pro-force-44549/pro-force-44549_operators-manual_1131062006.webp)
1
Removing the Blower from
the Crate
No Parts Required
Procedure
Important:
Install the jack stand to stabilize the
blower before the blower frame is unbolted from
the shipping crate or the crate is removed.
1.
Remove the top of the crate (
).
g021672
Figure 3
1.
Top of crate
3.
Top of machine
2.
End of crate
4.
Board under blower
housing
2.
Remove the end of the crate which is toward the
top of the machine (
).
3.
Remove the board that is under the blower
housing (
4.
Secure a strap to the top end assembly and lift
the pallet until the crate and blower is standing
up vertically (
).
g027060
Figure 4
1.
Lift strap
2.
Top end assembly
5.
Remove the snapper pin securing the jack-stand
tube to the storage tube (
). Remove the
jack assembly from the storage position.
g021674
Figure 5
1.
Snapper pin
2.
Jack-stand tube
6.
Remove the strap from the pallet and attach it to
the lift loop on the blower (
).
6
Содержание Pro Force 44549
Страница 17: ...Notes...
Страница 18: ...Notes...