background image

3

Installing the Latching
Components

Parts needed for this procedure:

2

Spring

Installing the Springs

1.

Install the spring in the hole in the lower end of the
angled tab on the side of the frame assembly (

Figure

10

).

G

013931

1

2

3

4

5

Figure 10

1.

Angled tab

4.

Post

2.

Hole in tab

5.

Groove

3.

Spring

2.

Hook one end of the spring into the hole and the other
end onto the spring post (

Figure 10

).

3.

Make sure that the spring end is seated properly in the
groove in the post (

Figure 10

).

4.

Repeat steps

1

through

3

for the other side.

5.

Tighten the 2 set screws in the left arm.

Adjusting the Tongue Position

Move the cradle assembly into the upper Transport position
to adjust the tongue.

1.

Lift up on the handles to raise the assembly while
slightly tipping it toward the tank.

2.

Guide the tongue under the crossbar with the welded
tab in the upper portion of the frame assembly.

3.

Let the assembly pivot down, toward the tank.

4.

Making sure that the plastic stops are in contact with
the spring tabs, apply enough pressure against the back

plate assembly of the cradle to compress the spring
tabs midway (

Figure 11

).

Figure 11

1.

Spring tab under pressure

3.

Spring tab

2.

Back plate

5.

While maintaining the pressure on the back plate, slide
the tongue toward you until the lip of the tongue plate
contacts the crossbar (

Figure 12

).

Figure 12

1.

Tongue-plate lip

3.

Slot in plate

2.

Fasteners

4.

Welded tab

6.

Tighten the fasteners in the tongue to secure its
position, then release pressure on the back plate.

Note:

Check to see if there is any play in the cradle.

It should be held snug to the frame assembly. You can
repeat this procedure once the eductor is installed to
adjust the locked position.

8

 

Содержание 41622

Страница 1: ...ucts you are responsible for operating the product properly and safely You may contact Toro directly at www Toro com for product safety and operation training materials accessory information help find...

Страница 2: ...ns For example use appropriate Personal Protective Equipment PPE including face and eye protection gloves or other equipment to guard against personal contact with the chemical Keep in mind that there...

Страница 3: ...Install the eductor valve and hoses Support frame assembly 1 Locknut 3 8 inch 1 Back plate assembly 1 Cradle arm right 1 Cradle arm left 1 Bushing 2 Pivot pin 2 Jam nut 3 8 inch 2 Handle 2 Bolt 3 8 x...

Страница 4: ...eeded for this procedure 1 Eductor valve assembly 2 Flange nut 1 4 inch 1 Fitting 1 inch 1 Retainer pins 1 Eductor valve bracket The bracket may already be installed from a previous kit installation 1...

Страница 5: ...pin refer to box C of Figure 4 6 Rotate the hose tee near the eductor valve 45 and install the new bypass hose Figure 5 Figure 5 1 Bypass hose 3 Pump tee 2 Relief hose 4 Supply hose 7 Remove the hori...

Страница 6: ...n the tank strap as shown in Figure 6 G013925 1 2 3 4 Figure 6 1 Main support frame assembly 3 Tank strap rear 2 Exposed bolt top 4 Exposed bolt side 4 Install a lock nut over the lower exposed bolt p...

Страница 7: ...e D Install a bushing into the outside hinge holes of the back plate assembly E Move the back plate assembly into position between the upper holes in each arm F Install a pivot pin through the upper h...

Страница 8: ...y tipping it toward the tank 2 Guide the tongue under the crossbar with the welded tab in the upper portion of the frame assembly 3 Let the assembly pivot down toward the tank 4 Making sure that the p...

Страница 9: ...4 Spring clamp 9 Extension bracket 5 Bolt 10 24 x 1 2 inch 10 Latch handle 2 Attach the extension bracket to the main support frame using 2 hex head bolts Figure 13 3 Connect the latch handle to the e...

Страница 10: ...on of the frame D Push until the clamp snaps over the pivot housing as shown in Figure 15 Figure 15 1 Spring clamp 2 Pivot housing 9 Check the eductor height on the cradle back plate and adjust it as...

Страница 11: ...ling the hole remove any rough edges in the cut and remove any debris that entered the main tank during the cutting process Installing the Bulkhead 1 Open the main tank lid and remove the filter scree...

Страница 12: ...ply Hose Parts needed for this procedure 1 Supply hose 1 Gasket 1 Worm screw clamp 1 Hose clamp 1 Hose adapter 1 Retainer pin Procedure 1 Secure the end of the supply hose without a bulkhead to the re...

Страница 13: ...barb and tighten the clamp to secure the fitting to the hose 7 Finishing the Installation Parts needed for this procedure 1 Suction lance and hose optional Procedure Note The suction lance and hose ar...

Страница 14: ...introduce chemicals from the eductor into the hose leading to the main tank Bottle Rinse The bottle rinse is located inside the eductor tank Once the eductor switch is on the bottle rinse has pressure...

Страница 15: ...stationary operation for additional heat protection Contact your Authorized Toro Distributor to obtain a Toro heat shield blanket kit for turf sprayers Using the Eductor The following procedure assume...

Страница 16: ...y from eductor and drain any remaining fluid into the hopper 5 Close the hopper valve red handle Shutting down the Eductor 1 Close all the valves Note Close the hopper valve first 2 Remove all chemica...

Страница 17: ...with flexible hoses 1 The bottle rinse nozzle is plugged or clogged 1 Disassemble the rotary portion of the nozzle from the lower valve assembly and back flush until the nozzle ports are clear of debr...

Страница 18: ...Notes 18...

Страница 19: ...3766 3636 Jean Heybroek b v Netherlands 31 30 639 4611 Victus Emak Poland 48 61 823 8369 European Privacy Notice The Information Toro Collects Toro Warranty Company Toro respects your privacy In order...

Страница 20: ...ot limited to damage to seats due to wear or abrasion worn painted surfaces scratched decals or windows etc Parts Parts scheduled for replacement as required maintenance are warranted for the period o...

Отзывы: