
Setup
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
Description
Qty.
Use
1
No parts required
–
Prepare the mower.
Double pulley assembly
1
2
Pulley nut
1
Install the pulley assembly.
3
No parts required
–
Remove the existing anti-scalp roller
and bracket.
Blower pivot
1
Metal template
1
Bolt (3/8 x 1 inch)
3
4
Locknut (3/8 inch)
3
Install the blower pivot for a 60 inch
bagger.
Link mounting bracket
1
Bolt, (3/8 x 1 inch)
3
5
Flanged locknut, (3/8 inch)
3
Install the link mounting bracket
Bagger mounting bracket
1
Link
1
Small clevis pin
2
Large clevis pin
2
Small cotter pin
2
6
Large cotter pin
2
Install the bagger mounting bracket
Handle assembly
1
Pin
1
7
Roll pin
2
Install the handle assembly.
Bagger assembly
1
Pin and hairpin cotter pin assembly
2
Nut (3/8 inch)
2
Threaded rod
1
Yoke
2
8
Clevis pin spring
2
Install the bagger assembly.
Blower belt
1
9
Spring
1
Route the blower belt into the blower
assembly.
10
Blower assembly
1
Install the blower assembly.
Upper tube
1
Middle tube
1
Lower tube
1
Bolt, (#10 x 3/4 inches)
6
Locknut, (#10)
6
11
Washer, (7/32 inch)
6
Install the discharge tubes.
Belt cover
Bolt (1/2 x 2-1/2 inches)
1
12
Nut (1/2 inch)
1
Install the belt cover and bolt.
13
No parts required
–
Install the weight kit.
14
No parts required
–
Check the tire pressure.
5
Содержание 30460
Страница 29: ...Notes 29...
Страница 30: ...Notes 30...