7
Installing the Handle Assembly
Parts needed for this procedure:
1
Handle assembly
1
Pin
2
Roll pin
Procedure
1.
Position the handle assembly onto the handle mount
assembly (
).
2.
Secure the handle assembly with a pin and a roll pin
(
).
Figure 10
1.
Handle assembly
3.
Pin
2.
Roll pin
4.
Handle mount assembly
8
Installing the Bagger
Assembly
Parts needed for this procedure:
1
Bagger assembly
2
Pin and hairpin cotter pin assembly
2
Nut (3/8 inch)
1
Threaded rod
2
Yoke
2
Clevis pin spring
Procedure
Note:
After installing the bagger, open the bagger door and
remove the discharge tubes.
1.
Position the bagger on its back (
2.
Slide the hooks onto the lower mounting bracket
(
).
3.
Rotate the bagger up on the lower bagger mounting
bracket.
4.
Align the hole in the bagger with the upper mounting
bracket (
).
5.
Install the pin and secure it with the hairpin cotter pin
on both sides (
).
10
Содержание 30460
Страница 29: ...Notes 29...
Страница 30: ...Notes 30...