
Ignition Coil Installation (continued)
Figure 272
2. Install the coil mounting bolt and shroud mounting stud onto the coil. Torque
the bolt and stud to 90 in-lbs. (10 Nm).
Set air gap:
0.0157-0.007 in (0.4-0.2 mm)
Figure 273
3. Install the spark plug wire to the spark plug.
1P65F-2 Service Manual
Page 8–11
Electrical System: Service and Repairs
3429-270 Rev A
Содержание 1P65F-2
Страница 2: ...Revision History Revision History Page 2 1P65F 2 Service Manual 3429 270 Rev A ...
Страница 6: ...Preface Page 6 1P65F 2 Service Manual 3429 270 Rev A ...
Страница 26: ...Specifications and Maintenance Torque Specifications Page 2 16 1P65F 2 Service Manual 3429 270 Rev A ...
Страница 32: ...Troubleshooting General Troubleshooting Page 3 6 1P65F 2 Service Manual 3429 270 Rev A ...
Страница 98: ...Fuel System Service and Repairs Page 6 34 1P65F 2 Service Manual 3429 270 Rev A ...
Страница 196: ...Electrical System Service and Repairs Page 8 22 1P65F 2 Service Manual 3429 270 Rev A ...