INSTALLATION
7. To route the cable through the X-axis energy chain, you must remove every other energy chain cover. Put
small, flat-blade screwdriver into the left rectangle opening and pry up. Then, pry up on the right rectangle
opening. Lift the cover and set it aside.
Figure 4: Removing a cover on the X-axis energy chain.
8. Repeat Step 7 for every other energy chain cover. The top and bottom energy chain covers are different
sizes, so keep them separate for re-installation.
9. Begin routing the brake cable through the X-axis energy chain and then down the side of the gantry.
10. Replace the energy chain covers that you set side earlier by sliding them back into place and snapping both
the top and the bottom to secure them.
11. Route the cable down the side of the gantry, through the cable tray on the bottom of the gantry, and then
into the Y-axis energy chain closest to the electrical cabinet.
12. Remove any necessary energy chain covers on the Y-axis energy chain with a short, small, flat-blade
screwdriver. Set aside the covers.
Page 7
©Tormach® 2022
Specifications subject to change without notice.
tormach.com
TD10801: Installation Guide: 24R Z-Axis Brake Retrofit Kit (0722A)