![Torin BIG RED JACKS T30306 Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/torin/big-red-jacks-t30306/big-red-jacks-t30306_owners-manual_1130161011.webp)
Page
11
of
48
SYSTEM AIR PURGE PROCEDURE
IMPORTANT: BEFORE FIRST USE
Perform the following Air Purge Procedure to remove any air that may have been introduced into the hydraulic
system as a result of product shipment and handling. This step is to be completed without any weight on the
jack.
1.
Turn release valve counterclockwise on full turn to the open position.
2.
Rapidly pump the handle 6-8 times. Leave handle in down position to expose oil fill plug.
FLAT BASE LONG RAM JACK
Содержание BIG RED JACKS T30306
Страница 18: ...Page 18 of 48 ASSEMBLY DIAGRAM FLAT BASE LONG RAM JACK ...
Страница 29: ...Page 29 of 48 ASSEMBLY DIAGRAM CLEVIS BASE LONG RAM JACK ...
Страница 31: ...Page 31 of 48 ASSEMBLY 1 Familiarize yourself with the jack AIR HYDRAULIC CLEVIS BASE LONG RAM JACK ...
Страница 44: ...Page 44 of 48 ASSEMBLY DIAGRAM AIR HYDRAULIC CLEVIS BASE LONG RAM JACK ...