Installation Instructions
20 - 30 Wide
Loosen slings and lower tent jacks. Move all jacks to the opposite side of the tent and place jacks at or near corners or
connection points. Place the slings around the perimeter tubes and operate the winch until the slack is taken up on all the
jacks. Working as a team, raise the tent until the legs can be slipped on. Immediately pin legs and install leg to rafter braces.
Lower jack to set the tent onto its legs. Remove slings and place jacks in the delivery truck.
Install the end legs, as shown, starting with the leg inside
of the tent at an angle then, push up and out until the leg
slips onto the connector. Pin leg with 3/8" D-Clasp pin
and install leg brace bar (30 wide only). Finish
connecting all the perimeter buckles. When tensioning
buckle straps, pull until the sidewall rope appears at the
bottom of the perimeter tube. The goal is to have the top
evenly and squarely affixed to the frame. Be sure that all
tie downs and tension straps are in place at the seams and
corners.
The tent must be anchored properly for safe tent
installation. Addditional guys and stakes may be required
depending upon soil and/or wind conditions
Caution! If Keder sidewalls are to be installed, it is necessary that all legs are
straight and in alignment. Legs must be spaced evenly apart for installation of
these sidewalls. A tape measure must be used to assure proper alignment.
BASE PLATE
DOUBLE-HEADED
STAKE
Anchoring Tent
( 10 )
AIFL 2030 1101