Tong Yi Fang Glass Machinery co.,ltd.
6
/
7
V. Control circuit diagram
(Notice: at first, turn on the blower, then heat.)
Страница 1: ...Yi Fang Glass Machinery CO LTD Add Lunjiao Industrial Roal Xichong Industrial Zone Lunjiao Town Shunde District Foshan City Guangdong Province China Tel 0086 757 27680965 Fax 0086 757 22891690 Web ww...
Страница 2: ...Tong Yi Fang Glass Machinery co ltd 2 7 Contents I Brief Introduction 3 II Operation steps 3 III Maintenance 3 IV Notice 5 V Control circuit diagram 6 VI Main circuit diagram 7...
Страница 3: ...perature can be set according to the process needs II Operation steps Before the machine working routine check is needed please operate as below steps 2 1 Start the water pump turn on the switch for t...
Страница 4: ...the machine working unstable easy to get broken on the friction surface and easy to get increased with the temperature 3 3 The first time to change the oil is after 300 hours working and then please c...
Страница 5: ...f locking function only after starting the blower the heating switch can be gone electricity 4 3 Scratches on the surface of the sponge rollers will affect their absorption capacity Their normal using...
Страница 6: ...Tong Yi Fang Glass Machinery co ltd 6 7 V Control circuit diagram Notice at first turn on the blower then heat...
Страница 7: ...Tong Yi Fang Glass Machinery co ltd 7 7 VI Main circuit diagram...