
42
9
PRIME AND DISCHARGE
3. When suc
N
ing water from a
¿
re hydrant, use a me-
diation metal to connect a delivery hose to the suc-
tion port without using the suction hose in principle.
. Set the discharge valve handle of the pump to the
full open position.
.
*
radually open the
¿
re hydrant on-off valve to the
full open position. However, chec
N
the water pres-
sure from
¿
re hydrant with suction pressure gauge
on the pump and adjust the opening of
¿
re hydrant,
if necessary.
CAUTION
If the
Z
ater pressure from
¿
re h
\
drant is
higher than 6
E
ar, do not continue to open
the
¿
re h
\
drant on-off valve.
If the
Z
ater pressure from fire h
\
drant
is higher than the required discharge
pressure, it is not necessar
\
to start the
pump.
If the
Z
ater pressure from fire h
\
drant
has not reached the required pump pres-
sure, start the engine.
6. If the water pressure from fire hydrant is insuf-
¿
cient, start the engine and adjust the pressure to
the re
T
uired level by operating the throttle dial.
Stop increasing discharge pressure if the suction
pressure gauge shows 1 bar or below. If it does,
stop increasing the pressure and
N
eep the throttle
dial as it is.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
Содержание VE 1000
Страница 2: ...003 12065 0_OM_cover_3Language_12mm indd 4 6 2016 08 03 8 42 ...
Страница 3: ...OWNER S MANUAL Original instructions VE1500 VE1000 003 12065 0 ...
Страница 102: ...84 19 WIRING DIAGRAM WIRING DIAGRAM 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 ...
Страница 107: ...BETRIEBSANLEITUNG Originalbetriebsanleitung VE1500 VE1000 003 12065 0 ...
Страница 213: ... 16758 2 6â8 Oryginalna instrukcja VE1500 VE1000 003 12065 0 ...
Страница 319: ...003 12065 0_OM_cover_3Language_12mm indd 4 6 2016 08 03 8 42 ...