
13
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
Priming lever
Used for suctioning water.
After starting the engine, pull the priming lever
2
to
suction water. After priming has been completed, re-
turn the priming lever
2
to its original position.
Floodlight
Use the
À
oodlight projector
3
to illuminate the location
where this
¿
re pump is operated.
Connect the
À
oodlight plug to connector
4
.
Loosen the adjust screw
5
and pull up the
À
oodlight
projector
3
to adjust its height. After the adjustment is
complete, tighten the adjust screw
5
.
CAUTION
Secure adequate lighting for the
location
Z
here this fire pump is
operated, other
Z
ise an accident
ma
\
occur.
5
DESCRIPTION OF DEVICES
3
5
2
4
Содержание VE 1000
Страница 2: ...003 12065 0_OM_cover_3Language_12mm indd 4 6 2016 08 03 8 42 ...
Страница 3: ...OWNER S MANUAL Original instructions VE1500 VE1000 003 12065 0 ...
Страница 102: ...84 19 WIRING DIAGRAM WIRING DIAGRAM 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 ...
Страница 107: ...BETRIEBSANLEITUNG Originalbetriebsanleitung VE1500 VE1000 003 12065 0 ...
Страница 213: ... 16758 2 6â8 Oryginalna instrukcja VE1500 VE1000 003 12065 0 ...
Страница 319: ...003 12065 0_OM_cover_3Language_12mm indd 4 6 2016 08 03 8 42 ...