PART 1. OPERATING OF CP UNIT AND NO. 200 PROGRAMMING
1. PRECAUTIONS FOR INSTALLATION OF CP-63
Please read following instructions carefully to ensure proper operation of the CP-63
1. Be careful about damage by static electricity as the CP-63
incorporates CMOS IC's. Do not touch components and connec-
tors.
2. Turn off the AC power switch when you take out or insert the
CP-63 unit, or any other unit.
3. Always insert the CP-63 unit into the "CP" slot. Otherwise,
there is a danger that the unit will be damaged.
4. Make sure mini-jumper for battery back-up is always placed in
ON position each time it is used.
5. Incorrect setting of function select switches may lead to incor-
rect performance.
6. Even if you do not need programming functions, be sure to carry
out initial programming and registration at station No.200 when
you install the new unit. Otherwise, some other functions may
not work properly.
7. The Ni-Cd battery GB50-3FA1 is capable of saving important
memory registration data even at times of power failure.
To keep the battery fully charged, do not cut the power off for
long hours during the first 8 days after new installation. The
CP-63 unit is capable of maintaining the programmed data for
the period of 4 weeks after fully charged even in the event of
long hours of power failure.
(About 4 weeks (25°C), About 8 days (40°C)
8. We suggest you replace the soldered button battery GB50-3FA1
(115-42-031-9) with the new one according to the following list
that shows an expected life span of the battery.
Be sure to make the station No.200 programming after replace-
ment of the battery.
Expected Life Span of small Ni-Cd Battery
Ambient temperature
of exchange
0°C
25° C
40° C
Ambient temperature
of battery
10°C
35° C
50° C
Life span
About 5 years
About 4 years
About 2 years
9. When shipping the CP-63 unit independently, place the mini-
jumper for battery back-up in "OFF" position. Cover the CP
back with cardboard, wrap connector section in aluminium foil
and put it in a conductive bag.
FUNCTION SELECT SWITCHES
These switches select functions.
Link Selection and
Time Interval Adjustment
for Paging Amplifier Power Remote.
SWITCH for #200 Programming
n only at time of initial programming of the
d registration of functions. In this case, station No.200
g station" but becomes a normal station when switch
"OFF" position.
t of the tie-line system, programming has to be set up in
.
n of each exchange becomes the Programming station:
R for battery back-up (JP1)
Y GB50-3FA1 (3.6V 50mAh)
R (JP2)
"A"
"B"
"C"
No. 200 (100)
No. 470 (400)
No. 740 (700)
— 11 —
SW-E (1 ~ 6)
SW-D (1 ~ 6)
SW-C (1 ~ 6)
SW-B (1 ~ 6)
SW-A (1 ~ 5)
PROGRAM
Set this to "ON" positio
exchange an
is "programmin
is placed in
Note:
In the even
every exchange
The first statio
MINI-JUMPE
Ni-Cd BATTER
FIXED MINI-JUMPE
Exchange
Exchange
Exchange
Note: Do not remove