5 of 7
Layout Foundation Plates
NB
Foundation plates for runs of 2 or more chevron blocks, will be
marked individually with a Block number and should be laid out numerically
from left to right when viewed from the front (refer to diagram R0019-010 below).
3
Fill Foundation & Insert Foundation Plates
Fill Foundation with ST5 concrete and insert foundation plates.
Ensure no gaps are present between individual plates
Ensure bottom of foundation plate is flush with concrete
Ensure plates are straight & level*
4
* Failure to ensure plates are straight and level can result in distorted visual appearance