background image

6 of 7

Fit the Chevron Blocks

Once the concrete has cured, fit the chevron blocks to the
foundation plates using M10 washer and M10 nylon insert nuts (items C & E) and tighten. 
Refer to diagram R0019-012 below.

NB

 For runs of 2 or more chevrons the left hand blade of each chevron block will be labelled with a 

block number. This corresponds with the block number marked on the foundation plate.
(see diagram R0019-011).

5

Содержание Evo Chev

Страница 1: ...nance These instructions must remain with the product to ensure correct installation The Evo Chev has been supplied with the following Items for installation Tools Required 17mm Socket Ratchet Chevron...

Страница 2: ...ng components 1 Item Description Quantity 3 Way Kit 4 Way Kit 5 Way Kit A Foundation Plate 1 1 1 B Cast in Cage Bar Assy 2 3 4 C M10 Form C Washer 8 12 16 D M10 Full Nut 4 6 8 E M10 Nylon Insert Nut 4...

Страница 3: ...7 Assemble the Foundation Plates Attach the Cast in Cage bars item B to the Foundation Plates as shown in diagrams below using M10 Form C Washer item C and M10 Full Nut item D Tighten with 17mm Socke...

Страница 4: ...4 of 7 Excavate Foundation Dig the foundation for the TMP EVO Chev block supplied as detailed in the following Foundation Size tables All dimensions below are in mm 2...

Страница 5: ...n viewed from the front refer to diagram R0019 010 below 3 Fill Foundation Insert Foundation Plates Fill Foundation with ST5 concrete and insert foundation plates Ensure no gaps are present between in...

Страница 6: ...using M10 washer and M10 nylon insert nuts items C E and tighten Refer to diagram R0019 012 below NB For runs of 2 or more chevrons the left hand blade of each chevron block will be labelled with a bl...

Страница 7: ...ement Products Limited company number 3207588 with our registered of ces at Traf c Management Products Limited Unit 6 Britannia Park Trident Drive Wednesbury WS10 7XB Version 11 07 2022 Need help 0208...

Отзывы: