![TMEIC PVU-L0800GR Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/tmeic/pvu-l0800gr/pvu-l0800gr_installation-manual_1121785013.webp)
4GBG1009
PVU-L0800GR / PVU-L0840GR / PVU-L0880GR Installation Manual
12
4. Tools, Machinery and Materials Required for Installation and Wiring
(1)
Machinery and materials for handling cargo
Overhead Crane, Truck-Mounted Crane, Forklift, etc
(2)
Machinery and materials for opening the packing
①
Nail Extractor Tool
(
Fig. 4.1
、
4.2
)
②
Hammer
③
Cutter/knife
④
Spanner/wrench
⑤
Other tools for uncrating
(3) Tools for Installation and Wiring
①
Screwdriver
(
)
※
Impact drivers are not allowed.
②
Spanner/wrench (for M8
、
M10
、
M12
、
M16)
③
Socket Wrench (for M8
、
M10
、
M12
、
M16)
④
Torque Wrench (for M8, M10, M12
、
M16)
⑤
Pinch Bar (Fig. 4.3)
⑥
Permanent Maker (Red)
⑦
Other tools for wiring
Fig. 4.2
Crowbar
Fig. 4.1
Nail Puller
Fig. 4.3
Pinch Bar
Approx. 300mm