172-65254M-03 (A-COS-10) 27 Oct 2008
9
5. Piping Support
Install the
COSPECT
, paying
attention to avoid excessive load,
bending and vibration.
Support the inlet and outlet
pipes securely.
6. Maintenance Space
Leave sufficient space for maintenance,
inspection and repair.
7. Trap Outlet Pipe
For ease of maintenance, installation of a union connection is recommended for
the trap outlet pipe.
Connect the outlet pipe to a
condensate return line, or extend it to
a trench. In the case of the latter,
make sure the end of the pipe is
above the waterline.
8. Blowdown Valve (requires optional plug)
In an environment of heavy dirt or scale, or when the air equipment is used only
periodically, be sure to install a strainer at the inlet of the
COSPECT
and a
blowdown valve on the main body.
1. Remove the plug from the main body.
2. Install the 10 mm blowdown valve.
3. Open the blowdown valve and blow any residual
dirt and scale off of the screen.
4. Periodically activate the blowdown valve to keep
the system free of dirt and scale.
Small Hole
Remove the
⅜
”
plug (optional)
and install the
blowdown valve
(Unit: mm)
approx.