Section 4 - Inspection, Installation & Start-up Checklist

RECEIVING & INSPECTION

 

ʋ

Unit Received Undamaged

 

ʋ

Unit Arrangement/Hand Correct

 

ʋ

Unit Arrangement Correct

 

ʋ

Unit Structural Support Complete & Correct

 

HANDLING & INSTALLATION

 

ʋ

Unit Mounted Level & Square 

 

 

ʋ

Proper Access Provided for Unit and Accessories

 

ʋ

Proper Electrical Service Provided 

 

 

ʋ

Proper Overcurrent Protection Provided   

 

ʋ

Proper Service/Switch Disconnect Provided 

 

 

ʋ

Proper Chilled Water Line Size to Unit 

 

 

ʋ

Proper Hot Water Line to Unit 

 

ʋ

All services to Unit in Code Compliance   

 

ʋ

All Shipping Screws & Braces Removed

COOLING/HEATING CONNECTIONS

 

ʋ

Protect Protect Valve Package Components from Heat

 

ʋ

Mount Valve Packages 

 

 

ʋ

Connect Field Piping to Unit   

 

ʋ

Pressure Test All Piping for Leaks

 

ʋ

Install Drain Line & Traps as Required

 

ʋ

Insulate all Piping as Required 

DUCT WORK CONNECTIONS

 

ʋ

Install Duct work, Fittings & Grilles as Required 

 

ʋ

Proper Supply & Return Grille Type & Size Used 

 

ʋ

Control Outside Air for Freeze Protection

 

ʋ

Insulate All Duct work as Required

ELECTRICAL CONNECTIONS

 

ʋ

Refer to Unit Wing Diagram   

 

ʋ

Connect Incoming Power Service or Services 

 

 

ʋ

Electrical Service of Correct Voltage or    

 Ampacity

 

to Support Unit Operating Loads

 

ʋ

All Field Wiring Installed with Code Compliance

 

ʋ

Check All Wiring for Secure Connections

UNIT STARTUP

 

ʋ

General Visual Unit & System Inspection   

 

ʋ

Record Electrical Supply Voltage 

 

 

ʋ

Record Ambient Temperature 

 

 

ʋ

Close All Unit Isolation Valves 

 

 

ʋ

Flush Water Systems 

 

 

ʋ

Fill Systems with Water/Refrigerant 

 

 

ʋ

Vent Water Systems as Required 

 

 

ʋ

All Duct work & Grilles in Place 

 

 

ʋ

All Unit Panels & Filters in Place 

 

 

ʋ

Start Fans, Etc.   

 

ʋ

Check for Overload Condition of All Units  

 

ʋ

Check All Duct work & Units for Air Leaks  

 

ʋ

Balance Air Systems as Required 

 

 

ʋ

Record All Final Settings for Future Use   

 

ʋ

Check Piping & Duct work for Vibration   

 

ʋ

Check All Dampers for Proper Operation   

 

ʋ

Verify Proper Cooling Operation

 

ʋ

Verify Proper Heating Operation

 

ʋ

Reinstall All Covers & Access Panels

Содержание THH Series

Страница 1: ...Redefine your comfort zone www titus hvac com THH HIGH PERFORMANCE HORIZONTAL FAN COIL UNITS INSTALLATION MANUAL...

Страница 2: ...9 Model THHC Free Return Dimensions 20 Model THHC Free Return Unit Specific Dimensions 21 Model THHP Plenum Return Dimensions 22 Model THHP Plenum Return Unit Specific Dimensions 23 THHE Exposed Cabin...

Страница 3: ...all power and control circuits prior to servicing to avoid serious crushing or dismemberment injuries HOT PARTS HAZARDS Electric Resistance heating elements must be disconnected prior to servicing El...

Страница 4: ...lly tested for proper operation and verified to be in full compliance with the factory manufacturing documents Customer furnished components such as control valves switches and DDC controls are not fa...

Страница 5: ...ties are void if foreign material is allowed to be deposited on the motor or blower wheels of any unit Some units and or job conditions may require some form of temporary covering during construction...

Страница 6: ...ction of moisture into the system In the event that leaking or defective components are discovered the Sales Representative must be notified BEFORE any repairs are attempted All leaks should be repair...

Страница 7: ...eplace the filter s as described above Section 1 Receipt Initial Installation FAN REMOVAL This fan assembly is easily removable by unscrewing the 4 E 20 nuts from the fan deck and sliding the fan asse...

Страница 8: ...are subjected to a high temperature which may damage seals or other materials Many two position electric control valves depending on valve operation are provided with a manual opening lever This leve...

Страница 9: ...lation by either the factory or the controls contractor should be located and checked for proper function and compatibility All internal components should be checked for shipping damage and all electr...

Страница 10: ...er duct work attached supply and return grilles in place and all access doors and panels in place and secure A clean filter of the proper size and type must also be installed Failure to do so could re...

Страница 11: ...0 7 08 High 1 1 4 1 1 3 1 3 8 5 0 13 2 1 6 2 8 5 9 1 3 2 6 5 4 Medium 1 1 6 3 3 1 0 0 8 Low 1 1 8 2 6 0 8 0 7 10 High 1 1 4 1 1 3 1 4 9 5 0 13 2 2 2 2 8 5 9 1 9 2 6 5 4 Medium 1 1 5 4 1 1 5 1 2 Low 1...

Страница 12: ...2900 6 0 2 2 470 THHC THHP 12 4 10 1400 43000 31800 8 7 4 2 560 THHC THHP 14 4 10 1750 47100 36250 9 6 3 0 715 THHC THHP 16 4 10 2000 51000 41000 10 5 2 0 830 THHC THHP 18 4 10 2200 53000 42000 11 0 2...

Страница 13: ...oticeable water noise or undesired valve operation due to incorrect system pressures After the entire system is balanced these conditions will not exist on properly designed systems CONTROLS OPERATION...

Страница 14: ...fan disconnect the motor wire leads loosen the set screw on the motor shaft and remove the 3 cap screws that attached the motor to the blower housing To reassemble insert the motor into the blower whe...

Страница 15: ...14 6 14 6 16 7 17 8 2 Row Dry 11 5 13 6 14 6 16 7 20 9 20 9 22 10 24 11 2 Row Wet 14 6 18 8 20 9 23 10 27 12 28 13 32 15 35 16 3 Row Dry 16 7 19 9 21 10 24 11 30 13 30 14 33 15 36 16 3 Row Wet 21 10...

Страница 16: ...al type and number of controls provided on each unit The integrity of all electrical connections should be verified at least twice during the first year of operation Afterwards all controls should be...

Страница 17: ...43 5 208 19 2 24 1 28 9 33 7 38 5 43 3 230 17 4 21 8 26 1 30 5 34 8 39 2 277 14 4 18 1 21 7 25 3 28 9 32 5 14 115 34 8 43 5 208 19 2 24 1 28 9 33 7 38 5 43 3 48 1 230 17 4 21 8 26 1 30 5 34 8 39 2 43...

Страница 18: ...ring the cooling season to maintain a free flowing condensate Should the growth of algae and or bacteria be a concern consult an air conditioning and refrigeration supply organization familiar with lo...

Страница 19: ...mplete unit model number 2 Unit hand connection right or left hand while facing the direction of airflow at the inlet 3 Complete part description including any numbers On warranty replacements in addi...

Страница 20: ...rd side mounted enclosure and includes 2 additional knockouts on bottom of unit on left side 3 Standard externally foam coated galvanized steel drain pan has 7 8 ODM copper outlet Stainless steel drai...

Страница 21: ...ip pan available for piping package condensate 4 Coil hand is field reversible left hand unit shown Unit Size Fan Qty A B C D E 06 1 14 356 20 508 23 1 8 587 34 864 6 7 8 175 08 1 19 483 25 635 28 1 8...

Страница 22: ...and ordinances 2 Optional bottom control enclosure with hinged cover replaces standard side mounted enclosure and includes 2 additional knockouts on bottom of unit on left side 3 Standard externally...

Страница 23: ...drip pan available for piping package condensate 4 Coil hand is field reversible left hand unit shown Unit Size Fan Qty A B C D E 06 1 14 356 20 508 23 1 8 587 34 864 16 406 08 1 19 483 25 635 28 1 8...

Страница 24: ...622 12 27 1 2 699 45 1 4 1149 34 864 31 1 2 800 14 32 1 2 826 50 1 4 1276 39 991 35 1 2 902 16 37 1 2 953 55 1 4 1403 44 1118 39 1 2 1008 18 42 1 2 1080 60 1 4 1530 46 1225 44 1 2 1130 20 46 1 2 1181...

Страница 25: ...12 62 1575 59 7 8 1599 32 814 31 7 8 811 60 1 8 x 36 1 8 1527 x918 14 67 1702 64 7 8 1646 36 916 35 7 8 912 65 1 8 x 36 1 8 1654 x 918 16 72 1829 69 7 8 1773 40 1017 39 7 8 1014 70 1 8 x 36 1 8 1781 x...

Страница 26: ...8 hw 4 7 8 16 hw 4 1 1 8 08 cw 4 7 8 16 cw 4 1 1 8 08 cw 6 7 8 16 cw 6 1 1 8 10 hw 1 5 8 18 hw 1 5 8 10 hw 2 5 8 18 hw 2 7 8 10 hw 3 7 8 18 hw 3 7 8 10 cw 3 7 8 18 cw 3 1 1 8 10 hw 4 7 8 18 hw 4 1 1 8...

Страница 27: ...IONS Install Duct work Fittings Grilles as Required Proper Supply Return Grille Type Size Used Control Outside Air for Freeze Protection Insulate All Duct work as Required ELECTRICAL CONNECTIONS Refer...

Страница 28: ...28 Installation Manual THH Redefine your comfort zone www titus hvac com THH HIGH PERFORMANCE HORIZONTAL FAN COIL UNITS Notes...

Страница 29: ...29 Installation Manual THH Redefine your comfort zone www titus hvac com Notes...

Страница 30: ...605 Shiloh Rd Plano TX 75074 ofc 972 212 4800 fax 972 212 4884 Redefine your comfort zone www titus hvac com...

Отзывы: