4
IOM - FFDE
Redefine your comfort zone. ™ | www.titus-hvac.com
IOM
FFDE / FFDER / FFDERA
Step 3.
Raise the unit and secure it into place using the chosen support
system method suspended from a structural support bracing.
Step 4.
Have an electrician wire the unit to the appropriate voltage,
according to the wiring diagram (page 21-23), and all national and local
electrical codes. All units are equipped with a three position terminal
block for field onnection. Verify correct singlephase power, before
energizing units.
Step 5.
Turn on the power using the two position rocker switch (ON/OFF)
located on the electrical box. For FFDR and FFDRA units, let the unit run for
a few hours to purge off particulate (if filters are shipped loose) that may
be adhered to the inside of the unit before installing the filters. Do not run
fan at full speed as this may cause overload condition.
Note:
Your fan filter may have been shipped separate. Controls have been
shipped separately.
Installation
Note:
Titus fan filter units are completely assembled at the factory with
the exception of the optional ¼”-20 eyebolts that are used when hanging
the unit from an engineered design support system and installation of the
HEPA/ULPA filters (eyebolts not included and can be ordered separately,
p/n 222449-001).
Step 1.
Carefully remove the unit from the shipping carton and inspect for
any damage that may have occurred during transportation (See Figure 1).
Note:
When ordering FFDR and FFDRA units, the HEPA filters may
be shipped separately to be installed into units after the fan box has
been installed.
Recommendation:
Review mode settings at this time as specified for
installation (see page 6 for controls).
Step 2.
If using rigidly supported grid (usually 2” (50 mm) or wider), raise
unit through ceiling and lower onto the gasketed grid. If using a flexible
grid (typically supported with wires), the unit must be secured to an
engineered design support system with s-hooks and chain. Screw the
four eyebolts into the nutserts on the lid assembly before lifting into an
overhead position (see Figure 2)
Note:
Confirm fan dimensions to match T-grid dimensions.
Figure 1: Unboxing
Figure 2: Hanger Supports
EYEBOLT
FAN FILTER
UNIT
Содержание FFDE
Страница 19: ...19 IOM FFDE Redefine your comfort zone www titus hvac com Motor Cable Configurations...
Страница 25: ...25 IOM FFDE Redefine your comfort zone www titus hvac com FFDE Filter Drawing...
Страница 26: ...26 IOM FFDE Redefine your comfort zone www titus hvac com IOM FFDE FFDER FFDERA FFDER and FFDERA Filter Drawing...
Страница 28: ...605 Shiloh Rd Plano TX 75074 ofc 972 212 4800 fax 972 212 4884 Redefine your comfort zone www titus hvac com...