5. Take off the guide bar and chain. (Fig.35d)
6. Ensure that the tension pin (D11) is adjusted to its far right position before assembly the
checked or the new chain and guide bar. If not, turn the tension screw (D12) anticlockwise
with the slotted screwdriver (E6). (See Fig. 35e)
7. Spread the saw chain (D6) around the guide bar (D7). Slide the chain into the groove
around the guide bar. Pay attention to the cutting direction.
8. Align the saw chain around the drive sprocket (D10) and place one corner of the guide bar
into a gap of the sprocket. (See Fig. 35f)
Fig. 35d
Fig. 35e
WARNING!
The direction of the saw chain 'cutters' must be as indicated by the arrow
on the pruner head!
Fig. 35f
9. Make sure the tension pin (D11) is inserted into the lower hole on the guide bar. (See Fig. 35g)
Fig. 35g
50
25CC PETROL MULTI TOOL TTK587GDO
Содержание TTK587GD0
Страница 1: ......