background image

 

22 

Test 2: 25 days after installation 

Test 3: 50 days after installation 

 

Test at least every 2 to 3 months thereafter.  Increase your testing frequency to monthly if 

contaminant levels begin to approach the maximum levels permitted by the U.S. EPA or 

Health Canada.  

We strongly recommend that the first water test after installation, and at 

least one test annually thereafter, be performed by a certified water testing lab.   

 

 

The following are the maximum contaminant levels permissible in drinking water under U.S. 

EPA and Health Canada guidelines at the time of printing of this manual (subject to change): 

 

Contaminant                         U.S. EPA Limit                        Health Canada Limit 

Arsenic:   

 

 

0.010 mg/l (ppm) 

 

0.010 mg/l (ppm) 

Uranium:  

 

 

0.03 mg/l (ppm) 

 

0.02 mg/l (ppm) 

Lead:    

 

 

0.015 mg/l (ppm) 

 

0.010 mg/l (ppm) 

Selenium:  

 

 

0.05 mg/l (ppm) 

 

0.01 mg/l (ppm) 

Antimony: 

 

 

0.006 mg/l (ppm) 

 

0.006 mg/l (ppm) 

Mercury:  

 

 

0.002 mg/l (ppm) 

 

0.001 mg/l (ppm) 

Cadmium:  

 

 

0.005 mg/l (ppm) 

 

0.005 mg/l (ppm) 

Chromium:    

 

0.1 mg/l (ppm) 

 

0.05 mg/l (ppm) 

 

mg/l = milligrams per liter 

ppm = parts per million 

1 mg/l = 1 ppm 

1,000 parts per billion = 1 part per million, so 0.010 ppm = 10 parts per billion (ppb) 

 

 

 

BACKWASH 

 

The backwash process is automatically engaged and controlled by your Fleck 5810XTR2 

valve.  Your system was pre-programmed at the factory.  In most cases, your system will be 

programmed to backwash every 10 days, or 3,000 gallons (whichever occurs first) at 

12:30am.   

 

There are 2 steps to the backwash process: 

 

Step 1: Backwash: factory pre-set for 10 minutes  

Содержание TOx-5810XTR2-10-54

Страница 1: ...omical treatment for the removal of arsenic uranium lead and other heavy metals APPLICABLE MODELS TOx 5810XTR2 Series PLEASE READ THIS MANUAL CAREFULLY BEFORE ATTEMPTING INSTALLATION FAILURE TO FOLLOW...

Страница 2: ...ol valve It is manufactured by one of the world s premier water treatment companies The Fleck 5810 control valve is well respected for its reliability serviceability simple operation and value The int...

Страница 3: ...ectric Water Heaters 12 Step 5 Prepare and Install Inlet and Outlet Plumbing Connection 12 Step 6 Drain Line Installation 15 Step 7 Control Valve Set up 16 Step 8 Initial Start up and Leak Testing 20...

Страница 4: ...capable of safely carrying out the procedure If the water treatment system is to be left unattended for an extended period of time vacation etc we strongly recommend that you turn off the water supply...

Страница 5: ...ding on other water chemistry conditions particularly if the water is soft Pre filtration to remove sediment and particulates will reduce required backwash frequency FOR IDEAL CONTAMINANT REDUCTION RA...

Страница 6: ...VEL IS GREATER THAN 60 PARTS PER BILLION 0 060 MG L PLEASE CONTACT ONE OF OUR CERTIFIED WATER TECHNICIANS FOR SIZING ASSISTANCE PHONE TOLL FREE 1 866 376 2690 A LEAD LAG CONFIGURATION OR LARGER MEDIA...

Страница 7: ...NS AND THE APPLICABLE CODES ARE IN CONFLICT THE RELEVANT PLUMBING ELECTRICAL CODE SHALL BE FOLLOWED EQUIPMENT FAILURE PERSONAL INJURY OR PROPERTY DAMAGE CAN RESULT IF THIS EQUIPMENT IS NOT INSTALLED P...

Страница 8: ...cation for installation of your water filter that is within close proximity to the main incoming water line of the home The location should have a firm level surface with enough space for the unit its...

Страница 9: ...been knocked out of alignment during shipping This can be correct by picking the tank up and tapping it on a hard surface while holding it perpendicular to the floor A few light taps will generally s...

Страница 10: ...llowing steps For the following steps we recommend that you wear a dust mask Take the bag box of gravel and using a small scoop add the gravel to the tank through the funnel to completely cover the lo...

Страница 11: ...wash DO NOT INITIATE A REGENERTION OF THIS SYSTEM FOR A MINIMUM OF 2 HOURS AFTER ADDING THE WATER TO ALLOW ADEQUATE PRE SOAKING BACKWASHING BEFORE THE MEDIA IS SATURATED MAY CAUSE A LOSS OF MEDIA AND...

Страница 12: ...much water out of the plumbing system as possible Following completion of the entire installation restore the water flow by turning on the household main water valve and allow all air to be purged fro...

Страница 13: ...flow When you are looking at the back of the control valve the inlet is on the left and the outlet is on the right Check the corresponding markings on the bypass to ensure the correct direction of wa...

Страница 14: ...ECTIONS AS YOU MAY INADVERTENTLY APPLY TOO MUCH PRESSURE ON THE VALVE WHILE SECURING THE ADAPTERS CAUSING DAMAGE TO THE VALVE BODY You will need to purchase the appropriate NPT threaded fittings to co...

Страница 15: ...ted ideally below the top of the head of your water filter Locate the drain port on the back of your control valve The drain line flow control assembly DLFC is pre attached to the control valve For ba...

Страница 16: ...emove the drain line flow control pull on the retaining clip to remove it and then grasp the drain line flow control and pull outward You may wish to dry fit the fitting first to make sure you line up...

Страница 17: ...need to reset to the home position when it is powered up If it does the motor will run for a few seconds Optional The touch screen is shipped with a protective plastic film that can be peeled off The...

Страница 18: ...will occur Other programming functions can be accessed using this icon however it is strongly recommended that you do not change any settings without first discussing with your dealer Regeneration Se...

Страница 19: ...ichever occurs first and to perform the backwash process at 12 30am in the morning when it is very unlikely that water will be required in the building If water is required during the backwash process...

Страница 20: ...d for 2 hours WITH THE BYPASS STILL IN THE BYPASS POSITION touch the REGENERATION ICON You will be given a choice to regenerate now or at regen time select now You will hear the valve motor change the...

Страница 21: ...tions Your system is now ready to provide treated water to your home PERFORMANCE MONITORING The contaminants removed by this treatment system including arsenic uranium lead and other heavy metals are...

Страница 22: ...it Health Canada Limit Arsenic 0 010 mg l ppm 0 010 mg l ppm Uranium 0 03 mg l ppm 0 02 mg l ppm Lead 0 015 mg l ppm 0 010 mg l ppm Selenium 0 05 mg l ppm 0 01 mg l ppm Antimony 0 006 mg l ppm 0 006 m...

Страница 23: ...equired For instance if your water consumption increases considerably or if your feed water conditions temporarily worsen you may want to perform a manual backwash You can choose to initiate a manual...

Страница 24: ...p left corner of the home screen and the following screen will appear Touch the grey box associated with the year 2 blue arrows will appear Touch the blue arrow on the left to decrease the year Touch...

Страница 25: ...r We recommend that the backwash be carried out in the middle of the night or other time where it is unlikely that water will be used for other purposes To adjust the time of day that the flush cycles...

Страница 26: ...creen Once in the Diagnostic Mode you can navigate to the next screen by pressing the right arrow on the top right corner of the screen or go back to the previous screen by pressing the left arrow on...

Страница 27: ...nformation for the past month The first screen allows you to see the average water usage by day of the week use the and icons to view other days of the week Select a day of the week to see detailed wa...

Страница 28: ...time driven 10 regen time 12 30 am vol override volumetric 3000 G REGEN Parameter Setting regen flow filter step 1 backwash time 1 10 m step 2 rapid rinse time 2 3 m RELAY Parameter Setting auxiliary...

Страница 29: ...wer failure Press any button to stop the Time of Day from flashing If power fails while the unit is in backwash the control will save the current valve position before it shuts down When power is rest...

Страница 30: ...lacement generally every 2 to 5 years See Service Bulletin 5810 1 for instructions on this procedure THE METSORB TITANIUM DIOXIDE MEDIA SHOULD BE REPLACED IF CONTAMINANT LEVELS FOUND DURING MONITORING...

Страница 31: ...installation A Additional backwash required A Perform 1 or more additional manual backwash cycles WARRANTY INFORMATION TITAN Ox systems are backed by a comprehensive warranty program The Fleck 5810XTR...

Страница 32: ...er warranty with HomePlus products Inc within 90 days of original purchase for the warranty to remain valid This warranty applies only in Canada and the United States of America In the event that a pa...

Страница 33: ...manufacture sale or supplying of the products or their use or disposition whether based upon warranty contract tort or otherwise shall not exceed the actual purchase price paid by the authorized deale...

Страница 34: ...34 MANUFACTURED BY HomePlus Products Inc 5 1490 Pearson Place Kamloops BC V1S 1J9 Canada Phone 250 374 2690 Fax 250 374 2692 www homeplusproducts com...

Отзывы: