![Timken Rollon Tecline Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/timken/rollon-tecline/rollon-tecline_use-and-maintenance_1118193008.webp)
Use and Maintenance
UM-8
Transport
Handling and lifting
Check axis integrity after shipment
• Transport, also based on the final destination, can be done with different
vehicles.
• Perform transport with suitable devices that have adequate loading
capacity.
• Ensure that the machine and its components are adequately anchored
to the vehicle.
• Correctly connect the lifting devices to the established points on the
packages and/or on the dismantled parts.
• Before handling, read the instructions, especially safety instructions,
provided in the installation manual, on the packages and/or on the
dismantled parts.
• DO NOT attempt, in any way, to bypass handling methods and the
established lifting, moving and handling points of each package and/or
dismantled part.
• Slowly lift the package to the minimum necessary height and move it
with the utmost caution to avoid dangerous oscillations.
• DO NOT perform handling with an inadequate visual field and when
there are obstacles along the route to reach the final location.
• DO NOT allow people to either transit or linger within the range of action
when lifting and handling loads.
• Do not stack packages to avoid damaging them, and reduce the risk of
sudden and dangerous movements.
• In case of prolonged storage, regularly ensure that there are no
variations in the storage conditions of the packages.
Every shipment is accompanied by a document (“Packing list”) with the
list and description of the axes.
• Upon receipt check that the material received corresponds to specifica-
tions in the delivery note.
• Check that packaging is perfectly intact and, for shipments without
packaging, check that each axis is intact.
• In case of damages or missing parts, contact the manufacturer to define
the relevant procedures.