![Timberk T-PAC12-P11E Скачать руководство пользователя страница 38](http://html1.mh-extra.com/html/timberk/t-pac12-p11e/t-pac12-p11e_instruction-manual_1116561038.webp)
IM2021
38
correctly; the process is controlled continuously by a competent person; the equipment
and cylinders meet the required standards.
c) Pump out the cooling agent system if possible.
d) If vacuuming is not possible, create a collector so that the cooling agent can be
removed from various parts of the system.
e) Ensure that the cylinder is positioned on the scale before the procedure is
performed.
f) Run the cooling agent pumping equipment and use it in accordance with the
manufacturer's instructions.
g) Do not overfill the cylinders (the liquid volume should not exceed 80%).
h) Do not exceed the maximum operating pressure of the cylinder, even temporarily.
i) After proper filling of the cylinders and completion of the process, make sure that the
cylinders and equipment are removed from the procedure site and that all shut-off
valves on the equipment are closed.
j) The extracted cooling agent shall not be refilled into another cooling system unless it
has been cleaned and checked.
18. Marking
The marking shall indicate that the equipment has been decommissioned and that
cooling agent has been emptied. The label shall contain date and signature. Ensure
that the equipment contains labels that denote that it contains a highly flammable
cooling agent.
19. Cooling agent extraction
The staff shall have extensive experience in extraction of the cooling agent safely
during equipment maintenance or decommissioning.
When injecting the cooling agent into the cylinders, ensure the use of the appropriate
cylinders. Ensure that the required number of cylinders is available to store the total
system charge. Make sure that all the used cylinders are designed for the extracted
cooling agent and have the marking appropriate for this type of cooling agent (i.e.
special cylinders for the cooling agent extraction). The cylinders shall be equipped with
a pressure relief valve and corresponding shut-off valves in proper working condition.
Empty cylinders shall be vacuumed and, if possible, cooled prior to the start of the
cooling agent pumping process.
The pumping equipment shall be in proper working condition; it shall have a set of
necessary instructions; and it shall be suitable for the extraction of flammable cooling
agents.
In addition, a set of calibrated scales shall be available and shall be in proper working
condition. The hoses shall be complete with sealed disconnecting couplings and shall
be in proper condition.
Before using the device to pump out the cooling agent, make sure that it is in a
satisfactory working condition, and that all relevant electrical components are sealed to
prevent fire in case of cooling agent release. In case of any doubts, please contact the
manufacturer.
The collected cooling agent shall be returned to the supplier of the cooling agent in a
proper container, with an appropriate waste material transfer invoice. Do not mix
cooling agents in drain installations and especially in cylinders.
In case of necessity to remove the compressors or compressor oils, make sure that
they have been pumped out to an acceptable level to ensure that no flammable cooling
agent remains in the oiling. The pumping process shall be carried out before returning
the compressor to the supplier. In order to speed up this process, use only electric
heating of the compressor housing. Handle the oil safely after its extraction from the
system.
Содержание T-PAC12-P11E
Страница 1: ...INSTRUCTION MANUAL RU 2 EN PORTABLE TYPE ELECTRIC AIR CONDITIONER 22 KZ 42 T PAC12 P11E...
Страница 2: ...IM2021 2 1 2...
Страница 3: ...IM2021 3 2 0 C 2 17 35...
Страница 4: ...IM2021 4 3 5 10A 8 R290 12 2...
Страница 5: ...IM2021 5 3 4 1 1 2 3 4 5 6 7 8...
Страница 7: ...IM2021 7 230 15 35 2 18 26 1134 Ruizhi 3 0 6 1 8 27 30 7 420 360 720 477 397 875 7 2 1 1 2 2...
Страница 8: ...IM2021 8 1 2 2 1 2 1 3 4 2 3 4 3 4 1 4 1 50 5 5...
Страница 9: ...IM2021 9 2 6 7 6 7 280 1500 8 1 2 Power 3 Mode 4 Up Down...
Страница 10: ...IM2021 10 5 Fan 6 Timer 1 24 1 7 Sleep Up Sleep...
Страница 11: ...IM2021 11 1 2 FULL 9 4 9 1 2 1 12 3 1 2 4...
Страница 12: ...IM2021 12 8 1 2 3 9 1...
Страница 13: ...IM2021 13 2 3 10 40 1...
Страница 14: ...IM2021 14 2 3 4 5 10 1 2 3 4 5 CO 2...
Страница 15: ...IM2021 15 6 7 8 9...
Страница 16: ...IM2021 16 10 11 12 13...
Страница 17: ...IM2021 17 14 OFN 15 OFN OFN OFN...
Страница 18: ...IM2021 18 16 OFN 17 a b c d e f g 80 h i j 18...
Страница 19: ...IM2021 19 19 11...
Страница 20: ...IM2021 20 12 7 35 17 3...
Страница 21: ...IM2021 21 13 14 1 2 30 C 50 C 15 85 5 E1 E2...
Страница 42: ...IM2021 42 1 2 2...
Страница 43: ...IM2021 43 17 35 3 5 10 R290 12 2...
Страница 44: ...IM2021 44 3 4 1...
Страница 46: ...IM2021 46 0 99 Class I 230 15 35 2 18 26 1134 Ruizhi 3 0 6 1 8 27 30 7 420 360 720 477 397 875 7 2 1 2 2...
Страница 47: ...IM2021 47 2 1 2 2 1 2 1 3 4 2 3 4 3 4...
Страница 48: ...IM2021 48 1 4 1 50 5 5 2 6 7 6 7 280 1500...
Страница 49: ...IM2021 49 8 1 2 Power 3 Mode 4 Up Down 5 Fan 6 Timer 1 24 1 7 Sleep Up...
Страница 50: ...IM2021 50 1 2 FULL 3 4...
Страница 51: ...IM2021 51 9 1 2 3 1 2 4...
Страница 52: ...IM2021 52 8 1 2 3 9 1 2 3...
Страница 53: ...IM2021 53 10 40 C 1 2 3 4 5...
Страница 54: ...IM2021 54 10 1 2 3 4 5 CO 2 6...
Страница 55: ...IM2021 55 7 8 9 10...
Страница 56: ...IM2021 56 11 12 13 14...
Страница 57: ...IM2021 57 OFN 15 OFN OFN OFN 16 OFN 17...
Страница 58: ...IM2021 58 a b c d e f g 80 h i j 18 19...
Страница 59: ...IM2021 59 11 12...
Страница 60: ...IM2021 60 7 35 C 17 C 3 E1 E2...
Страница 61: ...IM2021 61 13 14 1 2 30 C 50 C 15 85 5...
Страница 62: ...IM2021 62...
Страница 63: ......
Страница 64: ...www timberk ru...