15. Removal and vacuuming
The usual procedures shall be followed when interfering with the cooling agent circuit
to carry out repairs or for any other purpose. It is necessary to take into account the
flammability of the cooling agent when performing these procedures.
Carry out the following procedures:
Remove the cooling agent;
Purge the circuit with an inert gas;
Pump out the gas;
Purge with an inert gas again;
Open the circuit, using soldering or trimming
It is necessary to extract the cooling agent into special cylinders for extracting the
cooling agents,. The system shall be “flushed” with oxygen-free nitrogen (OFN) to
make the device safe. This process may need to be repeated several times. Do not
use compressed air or oxygen in this procedure.
Flush the system by breaking the vacuum in it with oxygen-free nitrogen (OFN) and
continuing to fill it until reaching the operating pressure; then release it into the
atmosphere, and then vacuum it again. This process shall be repeated until the
complete absence of the cooling agent in the system. In case of use of the last charge
of oxygen-free nitrogen (OFN), the system shall be reset to atmospheric pressure to
ensure its operability.
This operation is totally necessary before soldering on the pipelines. Make sure that
the outlet for the vacuum pump is not located near sources of ignition and that there is
ventilation.
16. Cooling agent recharging procedure
The following requirements shall be met in addition to the regular charging procedures.
- Ensure the absence of cross-contamination of different cooling agents during the use
of recharging equipment. Hoses or pipes shall be kept as short as possible in order to
minimize the amount of cooling agent contained in them.
- The cylinders for cooling agent recharging shall be in an upright position.
- Ensure the grounding of the cooling agent system before recharging the system.
- Mark the system when charging is complete.
- Be careful, do not overfill the cooling system.
Test the system under pressure with oxygen-free nitrogen (OFN) before recharging it.
The system shall be checked for leaks after charging is complete, but before
commissioning. Subsequent leak testing shall be carried out before leaving the device
installation site.
17. Decommissioning
The technician shall have enough knowledge of the equipment and all its details before
carrying out this procedure. Requires extensive experience to extract the cooling agent
safely. Before the procedure, take an oil and cooling agent sample in case of necessity
of analysis before reuse of the regenerated cooling agent. It is important to use
electricity only before the start of the procedure.
Procedure:
a) De-energize the device
b) Before the procedure, make sure that all the necessary equipment is available for
cooling agent cylinders; all personal protective equipment is available and used
Содержание T-PAC12-P11E
Страница 1: ...INSTRUCTION MANUAL RU 2 EN PORTABLE TYPE ELECTRIC AIR CONDITIONER 22 KZ 42 T PAC12 P11E...
Страница 2: ...IM2021 2 1 2...
Страница 3: ...IM2021 3 2 0 C 2 17 35...
Страница 4: ...IM2021 4 3 5 10A 8 R290 12 2...
Страница 5: ...IM2021 5 3 4 1 1 2 3 4 5 6 7 8...
Страница 7: ...IM2021 7 230 15 35 2 18 26 1134 Ruizhi 3 0 6 1 8 27 30 7 420 360 720 477 397 875 7 2 1 1 2 2...
Страница 8: ...IM2021 8 1 2 2 1 2 1 3 4 2 3 4 3 4 1 4 1 50 5 5...
Страница 9: ...IM2021 9 2 6 7 6 7 280 1500 8 1 2 Power 3 Mode 4 Up Down...
Страница 10: ...IM2021 10 5 Fan 6 Timer 1 24 1 7 Sleep Up Sleep...
Страница 11: ...IM2021 11 1 2 FULL 9 4 9 1 2 1 12 3 1 2 4...
Страница 12: ...IM2021 12 8 1 2 3 9 1...
Страница 13: ...IM2021 13 2 3 10 40 1...
Страница 14: ...IM2021 14 2 3 4 5 10 1 2 3 4 5 CO 2...
Страница 15: ...IM2021 15 6 7 8 9...
Страница 16: ...IM2021 16 10 11 12 13...
Страница 17: ...IM2021 17 14 OFN 15 OFN OFN OFN...
Страница 18: ...IM2021 18 16 OFN 17 a b c d e f g 80 h i j 18...
Страница 19: ...IM2021 19 19 11...
Страница 20: ...IM2021 20 12 7 35 17 3...
Страница 21: ...IM2021 21 13 14 1 2 30 C 50 C 15 85 5 E1 E2...
Страница 42: ...IM2021 42 1 2 2...
Страница 43: ...IM2021 43 17 35 3 5 10 R290 12 2...
Страница 44: ...IM2021 44 3 4 1...
Страница 46: ...IM2021 46 0 99 Class I 230 15 35 2 18 26 1134 Ruizhi 3 0 6 1 8 27 30 7 420 360 720 477 397 875 7 2 1 2 2...
Страница 47: ...IM2021 47 2 1 2 2 1 2 1 3 4 2 3 4 3 4...
Страница 48: ...IM2021 48 1 4 1 50 5 5 2 6 7 6 7 280 1500...
Страница 49: ...IM2021 49 8 1 2 Power 3 Mode 4 Up Down 5 Fan 6 Timer 1 24 1 7 Sleep Up...
Страница 50: ...IM2021 50 1 2 FULL 3 4...
Страница 51: ...IM2021 51 9 1 2 3 1 2 4...
Страница 52: ...IM2021 52 8 1 2 3 9 1 2 3...
Страница 53: ...IM2021 53 10 40 C 1 2 3 4 5...
Страница 54: ...IM2021 54 10 1 2 3 4 5 CO 2 6...
Страница 55: ...IM2021 55 7 8 9 10...
Страница 56: ...IM2021 56 11 12 13 14...
Страница 57: ...IM2021 57 OFN 15 OFN OFN OFN 16 OFN 17...
Страница 58: ...IM2021 58 a b c d e f g 80 h i j 18 19...
Страница 59: ...IM2021 59 11 12...
Страница 60: ...IM2021 60 7 35 C 17 C 3 E1 E2...
Страница 61: ...IM2021 61 13 14 1 2 30 C 50 C 15 85 5...
Страница 62: ...IM2021 62...
Страница 63: ......
Страница 64: ...www timberk ru...