First Fix Kit – Installing the Back Box
Please note –
A technically competent person should carry out the
installation of your TileVision
®
unit.
First Fix Kit – Unpacking and Initial Assembly
Installation and positioning
If this has not already been cut, the 19" unit requires a recess of 500 mm x 357 mm and 75 mm
depth from the front face of the tiles.
Fit the back box into the wall ensuring that the cable inlets are facing downwards.
To adjust the position of the back box loosen the eight screws, which attach the left and right hand
brackets to the back box, these screws are located each side within the back box. Ensure that you
do not fully unscrew the fasteners to avoid detaching the brackets from the back box.
Adjust the alignment of back box making sure the front edge of the back box sits flush with the front
face of the tiles.
Secure all eight screws to lock the back box into position.
☛
Note: Removal of the front glass requires a force
of 200 kg when using a glass suction lifter. The
box must be secured to the wall so that it is able
to withstand the pulling force.
Wall
Flange
Grout
Tile adhesive
Tile
Back box
Plug and screw
or wall bolt fixings
Machine
screw
Example of a back box installed in a ‘solid’ wall
Unpacking your TileVision
®
Within the back box there are two right-angled brackets and eight fixing screws. Screw the brackets
to the outside of the back box but be aware these will need to be loosened to allow adjustment of
the back box when fitted into the wall.
As shown below, the brackets allow 36 mm of forwards/backwards adjustment so that the front of
the back box can fit flush with the tiled surface. Any additional adjustment needed to ensure the
front of the back box is flush with the tiles should be considered before fitting the back box.
Lead to earthing clamp on
cold water pipe from either of
the earthing points inside the
back box (lead not supplied)
75
36
The range of adjustment available with the back box brackets
The qualified
electrical installer
must use one of the
earthing screws as
an earth point to
earth the unit to
ground.
The lead used must
be terminated with a
ring terminal, which,
together with the
earthing cable’s ring
terminal, is fastened
using the supplied
locking washer and
screw.
The first fix kit consists of:
1 stainless steel back box with 2 fixing brackets and 8 screws
1 single stereo speaker and 4.5 metres of 4-core speaker cable
1 AC/DC adaptor with integral 4 metre lead and 2 AC leads
1 polystyrene aperture protective cover
1 TileVision
®
instruction manual.
☛
If any items are missing,
contact the dealer that
supplied the TileVision
®
.