background image

 

18 | 

P a g e

 

Tigo Energy, Inc.

 | 

www.tigoenergy.com

 | 

[email protected]

 

Commissioning 

 

Caution

High voltages in the PV system. Risk of serious injury due to 

electric shock. Only electrically qualified personnel may perform 

work on the PV system. 

 

Warning

Read all instructions, cautions and warnings for the EI Inverter and 

connected devices. 
Installation and commissioning must be performed by a licensed 

electrician or other qualified person in accordance with local, state 

and National Electric Code ANSI/NFPA 70 requirements. 

 

 

Pre-power Check 

Use the following check list prior to powering on the EI Residential Solution. 

Table 5 Pre-power checklist 

 

Item 

Acceptance 

 

ATS installation 

The ATS is installed correctly, securely, and reliably 

 

Conduit layout 

Conduit and conductors are routed properly, and as requested 

by the customer 

 

Conductors 

The AC conductors are labeled, connected correctly and 

securely. 

 

Grounding 

Ground conductors are connected correctly, securely, and 

reliably. 

 

Cable ties 

Cable ties are secured evenly with no sharp protrusions. 

 

Conduit connections 

All conduit attachments are sealed and bonded, when 

necessary. 

 

Unused conduit 

openings 

Any unused conduit openings are fitted with waterproof caps 

(provided) or left unopened. 

 

Disconnect switches  All external disconnect switches connecting to the ATS are in 

the OFF position. 

 

Wire box cleanliness  The wire box is left clean and tidy. 

 

Installation 

environment 

An appropriate installation space had been chosen and the 

environment is left clean and accessible. 

 

Torque Table 

Table 6 Torque table 

Ground bus 

1.0Nm 

Output terminals 

3.5Nm 

Inverter terminals 

2.5Nm 

Grid terminals 

2.5Nm 

Содержание TSS-50-US

Страница 1: ...1 P a g e Tigo Energy Inc www tigoenergy com support tigoenergy com Tigo Energy Intelligence Automatic Transfer Switch Installation and Operation Manual 002 00088 00 10 22 2021...

Страница 2: ...R MERCHANTABILITY OTHER THAN THOSE SPECIFICALLY SET OUT IN ANY EXISTING CONTRACT BETWEEN THE PARTIES ANY SUCH CONTRACT STATES THE ENTIRE OBLIGATION OF TIGO THE CONTENTS OF THIS DOCUMENT SHALL NOT BECO...

Страница 3: ...8 Pre Installation 8 EI ATS Package Contents 8 Tools Items Needed for Installation 9 EI ATS Overview 9 EI ATS Labels 10 EI ATS Weight and Dimensions 11 Installation 12 Installation requirements 12 Mou...

Страница 4: ...gy Inc www tigoenergy com support tigoenergy com Troubleshooting 20 Your Tigo Customer Support contact 20 Decommissioning 22 Packing the ATS 22 Storing the EI ATS 22 Disposing of the ATS 22 Warranty 2...

Страница 5: ...ait entra ner la mort ou des blessures graves CAUTION indicates a hazardous situation which if not avoided could result in minor or moderate injury and damage of the product ATTENTION indique une situ...

Страница 6: ...to cause cancer For more information refer to www P65Warnings ca gov Caution This product must operate within the technical specifications of the datasheet Damage caused by failure to follow the cont...

Страница 7: ...l monitoring rapid shutdown and best in class module level optimization with Tigo s patented Predictive IV 3 EI Battery optional The LFP battery is designed for use specifically with the EI Inverter U...

Страница 8: ...Installation of the equipment can take place concurrently although the EI Inverter is the hub of all equipment in this system Where a workstream can split off from the main efforts of ATS installation...

Страница 9: ...l bit Drilling pilot holes for mounting Bit size will depend on the mounting surface material and anchor sizes required Wire cutter crimping tool Crimping wire ferrules O type terminal and wire prepar...

Страница 10: ...mber Figure 4 Specifications label Specifications Certifications Safety Info icons Tigo EI App There are three labels on the inside of the ATS to help identify the correct termination points for the c...

Страница 11: ...tility grid input This allows the essential loads to be powered by the utility when the grid is operating normally GRID L1 L2 Figure 7 Grid input label EI ATS Weight and Dimensions Table 3 Weight and...

Страница 12: ...ly be made by qualified personnel Installation requirements The ATS installation must comply with the following requirements Select a wall or solid vertical surface that can support the EI ATS Select...

Страница 13: ...tions below are for securing the enclosure to drywall If another surface is used use appropriate hardware to securely mount the ATS 1 Use a level and the mounting bracket H to mark the mounting holes...

Страница 14: ...pe terminals Accessory parts needed Wire ferrules G O Type terminals F conductors conduit and associated conduit fittings conductor labels Three circuits will be terminated in the ATS one from the EI...

Страница 15: ...e the wire cutters to strip 15mm of insulation from one side of the conductor and crimp the wire ferrule to the end of the conductor 2 To prepare the ground conductors strip 7mm of insulation if using...

Страница 16: ...5Nm The opposite end of these conductors will terminate in the EI Inverter s Backup terminals as shown in Figure 14 Grid connections Tools needed Philips screwdriver Figure 16 Grid connections 1 Use t...

Страница 17: ...1 Use the screwdriver to secure the grid backup EGC to the grounding bus bar Torque to 1Nm 2 Use the screwdriver to loosen screws in positions L1 N and L2 at the OUTPUT terminal 3 Insert L1 N and L2 o...

Страница 18: ...y and reliably Conduit layout Conduit and conductors are routed properly and as requested by the customer Conductors The AC conductors are labeled connected correctly and securely Grounding Ground con...

Страница 19: ...installed and ready to be commissioned open the EI mobile App to commission the EI Residential Solution Keep the installation manual and keys nearby Refer to the EI Inverter manual for the Powering on...

Страница 20: ...and check the control line the INV and OUTPUT conductors are properly connected to the correct terminals 3 If issues persist please contact Tigo Customer Support team Your Tigo Customer Support conta...

Страница 21: ...dule Vmp Module Imp Number of modules in each string The Tigo Customer Support Team can be contacted in multiple ways Chatting with a Customer Support tech through the EI App Submitting a ticket direc...

Страница 22: ...ittings 6 Lift the ATS enclosure off the wall and set aside 7 Unscrew the mounting bolts from the wall and remove from the wall Packing the ATS When possible pack the ATS in the original packaging and...

Страница 23: ...23 P a g e Tigo Energy Inc www tigoenergy com support tigoenergy com Specifications...

Отзывы: