Tigo Energy, Inc.

 | 

www.tigoenergy.com

 | 

[email protected]

 

EI Residential Solution Overview 

The Tigo Energy Intelligence (EI) Automatic Transfer Switch (ATS) is a self-acting switch which 
acts to safely isolate the utility conductors and switch to the backup power source during a grid 
outage. The ATS is a vital component in any grid-tied, storage backup system and a required 
component of the EI Residential Solution when the EI Battery is included. 

The Energy Intelligence Residential Solution 

The EI Residential Solution includes the following components:  

1.

 

EI Inverter

 

 The TSI-7.6K-US and TSI-11.4K-US inverters may be installed as grid-

tied only or as an energy storage system when paired with the EI Battery. The inverter 
co

nverts the PV array’s DC energy to AC for 

use in the building and when paired with an 

EI Battery, acts as the battery management unit. 

2.

 

TS4 

 

Tigo’s 

MLPE, the TS4-A-F provides module-level rapid shutdown. The TS4-A-O 

provides module-level monitoring, rapid shutdown, and best-in-class module-level 

optimization with Tigo’s patented 

Predictive IV.  

3.

 

EI Battery

 (optional) 

 The LFP battery is designed for use specifically with the EI 

Inverter. Up to four battery enclosures may be installed with the EI Inverters. 

4.

 

EI ATS

 (optional / required when batteries are used) 

 The EI ATS is an automatic 

transfer switch which switches the home loads from grid + Solar/battery usage to 
solar/battery usage only when the grid goes down. This is a required component to any 
energy storage system when connected to the utility grid as it prevents the potential for 
dangerous backfeed on the utility

’s

 conductors. 

5.

 

Energy Meter

 

 (optional / required when batteries are used) 

 The energy meter 

monitors the import and export of energy into the 

home’s

 electrical system. This allows 

the inverter to determine when and how much energy is required from the battery to 
serve connected loads. 

6.

 

Energy Intelligence

 

 Accessible through the web or mobile app, the EI Platform 

provides visibility into system and module performance. The EI mobile app is also used 
for commissioning the EI Residential Solution. 
 

 

Figure 1 EI System Diagram 

5

 

6

 

Содержание TSS-50-US

Страница 1: ...1 P a g e Tigo Energy Inc www tigoenergy com support tigoenergy com Tigo Energy Intelligence Automatic Transfer Switch Installation and Operation Manual 002 00088 00 10 22 2021...

Страница 2: ...R MERCHANTABILITY OTHER THAN THOSE SPECIFICALLY SET OUT IN ANY EXISTING CONTRACT BETWEEN THE PARTIES ANY SUCH CONTRACT STATES THE ENTIRE OBLIGATION OF TIGO THE CONTENTS OF THIS DOCUMENT SHALL NOT BECO...

Страница 3: ...8 Pre Installation 8 EI ATS Package Contents 8 Tools Items Needed for Installation 9 EI ATS Overview 9 EI ATS Labels 10 EI ATS Weight and Dimensions 11 Installation 12 Installation requirements 12 Mou...

Страница 4: ...gy Inc www tigoenergy com support tigoenergy com Troubleshooting 20 Your Tigo Customer Support contact 20 Decommissioning 22 Packing the ATS 22 Storing the EI ATS 22 Disposing of the ATS 22 Warranty 2...

Страница 5: ...ait entra ner la mort ou des blessures graves CAUTION indicates a hazardous situation which if not avoided could result in minor or moderate injury and damage of the product ATTENTION indique une situ...

Страница 6: ...to cause cancer For more information refer to www P65Warnings ca gov Caution This product must operate within the technical specifications of the datasheet Damage caused by failure to follow the cont...

Страница 7: ...l monitoring rapid shutdown and best in class module level optimization with Tigo s patented Predictive IV 3 EI Battery optional The LFP battery is designed for use specifically with the EI Inverter U...

Страница 8: ...Installation of the equipment can take place concurrently although the EI Inverter is the hub of all equipment in this system Where a workstream can split off from the main efforts of ATS installation...

Страница 9: ...l bit Drilling pilot holes for mounting Bit size will depend on the mounting surface material and anchor sizes required Wire cutter crimping tool Crimping wire ferrules O type terminal and wire prepar...

Страница 10: ...mber Figure 4 Specifications label Specifications Certifications Safety Info icons Tigo EI App There are three labels on the inside of the ATS to help identify the correct termination points for the c...

Страница 11: ...tility grid input This allows the essential loads to be powered by the utility when the grid is operating normally GRID L1 L2 Figure 7 Grid input label EI ATS Weight and Dimensions Table 3 Weight and...

Страница 12: ...ly be made by qualified personnel Installation requirements The ATS installation must comply with the following requirements Select a wall or solid vertical surface that can support the EI ATS Select...

Страница 13: ...tions below are for securing the enclosure to drywall If another surface is used use appropriate hardware to securely mount the ATS 1 Use a level and the mounting bracket H to mark the mounting holes...

Страница 14: ...pe terminals Accessory parts needed Wire ferrules G O Type terminals F conductors conduit and associated conduit fittings conductor labels Three circuits will be terminated in the ATS one from the EI...

Страница 15: ...e the wire cutters to strip 15mm of insulation from one side of the conductor and crimp the wire ferrule to the end of the conductor 2 To prepare the ground conductors strip 7mm of insulation if using...

Страница 16: ...5Nm The opposite end of these conductors will terminate in the EI Inverter s Backup terminals as shown in Figure 14 Grid connections Tools needed Philips screwdriver Figure 16 Grid connections 1 Use t...

Страница 17: ...1 Use the screwdriver to secure the grid backup EGC to the grounding bus bar Torque to 1Nm 2 Use the screwdriver to loosen screws in positions L1 N and L2 at the OUTPUT terminal 3 Insert L1 N and L2 o...

Страница 18: ...y and reliably Conduit layout Conduit and conductors are routed properly and as requested by the customer Conductors The AC conductors are labeled connected correctly and securely Grounding Ground con...

Страница 19: ...installed and ready to be commissioned open the EI mobile App to commission the EI Residential Solution Keep the installation manual and keys nearby Refer to the EI Inverter manual for the Powering on...

Страница 20: ...and check the control line the INV and OUTPUT conductors are properly connected to the correct terminals 3 If issues persist please contact Tigo Customer Support team Your Tigo Customer Support conta...

Страница 21: ...dule Vmp Module Imp Number of modules in each string The Tigo Customer Support Team can be contacted in multiple ways Chatting with a Customer Support tech through the EI App Submitting a ticket direc...

Страница 22: ...ittings 6 Lift the ATS enclosure off the wall and set aside 7 Unscrew the mounting bolts from the wall and remove from the wall Packing the ATS When possible pack the ATS in the original packaging and...

Страница 23: ...23 P a g e Tigo Energy Inc www tigoenergy com support tigoenergy com Specifications...

Отзывы: