BEFORE YOU GET STARTED
04
tigersheds.com
0113 205 4189
TOOLS REQUIRED
We recommend using the following tools (not supplied):
SCREW
RUBBER MALLET
DRILL
LADDER
TAPE MEASURE
SHARP KNIFE
SPIRIT LEVEL
ASSEMBLY
• Assembly is straightforward if you follow these step-by-step instructions.
• We recommend getting everything aligned properly before screwing together and that
screw holes should be pre-drilled to avoid splitting the timber. (Do not come pre-drilled).
IMPORTANT
• Before assembly, please make sure you have a suitable base ready to erect your building on.
• Your base MUST be level and flat to ensure that the building is assembled properly and is square.
• Please carefully remove the untreated timber supports that make up the boxed pallet and unpack the components in
your delivery.
• DO NOT start your build until you have checked that all the parts of your building are present and in a suitable condition.
• If you are organising a third party to install your building, it is best practice not to schedule this immediately on receipt of
your order, to give you time to check your delivery.
HAMMER
WOOD SAW
C13
FIXING KIT CONTENTS:
Clout Nails
(13mm Galvanised - QTY 80)
S25
Black Screws
(25mm - QTY 16)
N30
Nails
(30mm Galvanised - QTY 140)
N40
Nails
(40mm Galvanised - QTY 20)
S35
Screws
(35mm - QTY 192)
S40
Screws
(40mm - QTY 24)
S80
Screws
(80mm - QTY 18)
Содержание TIGERFLEX Copia
Страница 1: ...TIGERFLEX APEX LOGCABIN GENERAL ASSEMBLY INSTRUCTIONS TIG INS38...
Страница 11: ...11 Please retain instructions for future reference B Q B D Q A B D...
Страница 13: ...13 Please retain instructions for future reference B Q A D Q D B B...
Страница 31: ...31 Please retain instructions for future reference...