background image

Please retain instructions for future reference

23

Step 16:

DOOR FASCIA ASSEMBLY

(MODULE PACKS: FXCD1/2/3 & U)

•  Open Module Pack “U”. 

•  Take door frame and attach the external fascias only. On    
  a door, the external side fascias are the longer of the two 
  supplied. (1770mm) 

•  Attach side fascias first. Secure using 3x S35 evenly 
  spaced per fascia.  Angle pilot hole first and then screw    
  through fascia board into frame. 

•  Repeat the process for the header and bottom fascia 
  board using 3x S35 evenly spaced per fascia.

S35

S35

Содержание TIGERFLEX Copia

Страница 1: ...TIGERFLEX APEX LOGCABIN GENERAL ASSEMBLY INSTRUCTIONS TIG INS38...

Страница 2: ...treated with a suitable wood preserver or paint AFTER assembly both internally and externally BUILDING A BASE Care must be taken to ensure the product is placed on a suitable base When thinking about...

Страница 3: ...rs to erect your building With their knowledge and experience they will ensure that your cabin is put properly in place ready for you to enjoy your space for years to come If you have not booked our P...

Страница 4: ...on Your base MUST be level and flat to ensure that the building is assembled properly and is square Please carefully remove the untreated timber supports that make up the boxed pallet and unpack the...

Страница 5: ...le Pack to reduce the risk of falling components All Module Packs are individually banded together For ease remove from vertical position on pallet and cut Module Pack banding when on a dry horizontal...

Страница 6: ...RER ASSEMBLY Position floor bearers as shown Assemble inner tanalised floor bearers floor joists using 4x S80 Detail A Use floor jointing piece as a guide for spacing between inner tanalised floor bea...

Страница 7: ...IED Place half logs as shown Secure to tanalised floor bearer through notch at end using 1x S40 per notch Detail B Using a utility knife or similar cut a slight notch in the top tongue of each half lo...

Страница 8: ...n one of the gable ends place your first floorboard at the door end chosen This is referred to as the Door Board Leave approx 2mm gap at the edges 08 tigersheds com 0113 205 4189 sales tigersheds com...

Страница 9: ...Do not trim Step 6 FLOOR ASSEMBLY MODULE PACKS H J Q From the Door Board see Step 3 work your way across the frame securing remaining floorboards using 10x N30 per floorboard NOTE YOU WILL NEED TO RE...

Страница 10: ...ONING OF DOORS WINDOWS Lay out the module packs supplied in the position you would like them to be constructed See examples for some inspiration All following instructions will be based on configurati...

Страница 11: ...11 Please retain instructions for future reference B Q B D Q A B D...

Страница 12: ...12 tigersheds com 0113 205 4189 sales tigersheds com TIGERFLEX APEX LOG CABIN GENERAL INSTRUCTIONS B Q B D Q A D B...

Страница 13: ...13 Please retain instructions for future reference B Q A D Q D B B...

Страница 14: ...secure in place as shown using 1x S40 per cut log Detail E ADDITIONAL STEPS FOR DOOR POSITIONING OR FULL PANE WINDOWS ON GABLE If you are having a door or full pane window on the end remove the full...

Страница 15: ...ow frame Use supplied construct diagram for reference Secure 274mm cut log through notch into log below using 1x S40 Drill a pilot hole at an angle through the cut log into the full log below and scre...

Страница 16: ...m cut logs through notch into log below using 1x S40 Drill a pilot hole at an angle through the cut log into the half log below and screw into place as shown using 1x S40 Detail E In Step 8 For Refere...

Страница 17: ...ct diagram for reference Secure full bottom log through notch into log below using 1x S40 Drill a pilot hole at an angle through the cut log into the half log below and screw into place as shown using...

Страница 18: ...IONS 18 tigersheds com 0113 205 4189 sales tigersheds com Step 12 WALL ASSEMBLY STAGE 2 MODULE PACKS F T Install apex gable tops as shown Detail I Secure apex gable tops into walls using 2x 35mm S35 s...

Страница 19: ...spacers to central gable tops using 2x 35mm S35 screws per spacer as shown Screw through gable tops into spacer from either side Detail K L Apex gable top removed in Detail H to show 190mm spacer Rep...

Страница 20: ...ie lower edge of roof panels together on both sides of cabin using 190mm spacers Secure using 2x35mm S35 screws per joint Detail P Secure roof to walls and gable tops using the following steps 3x 35mm...

Страница 21: ...ttach the external fascia only On a window the external side fascia is the longer of the two supplied 1770mm Attach side fascias first Secure using 3x S35 evenly spaced per fascia Angle pilot hole fir...

Страница 22: ...ttach side fascias first Secure using 3x S35 evenly spaced per fascia Angle pilot hole first and then screw through fascia board into frame Repeat the process for the header and bottom fascia board us...

Страница 23: ...the external fascias only On a door the external side fascias are the longer of the two supplied 1770mm Attach side fascias first Secure using 3x S35 evenly spaced per fascia Angle pilot hole first a...

Страница 24: ...E THERE WILL BE A GAP EITHER SIDE TO ALLOW FOR MOVEMENT OF LOGS Secure the window to the walls using 7x S35 evenly spaced Internal fascias can be installed at this point These are fixed to the window...

Страница 25: ...r on the half log Secure the door to the walls using 7x S35 evenly spaced Internal fascias can be installed at this point These are fixed to the door frames only Do not attach to the logs See Step 14...

Страница 26: ...battens in place as shown Detail R Battens in 2 pieces so need to be butted together Secure to side walls using 4x 35mm S35 screws per corner x2 per batten Secure side skirting as shown using 3x 35mm...

Страница 27: ...Please retain instructions for future reference 27 ROOF PANELS REMOVED FOR CLARITY Roof battens in place 4 places Floor skirting in place 4 places...

Страница 28: ...ST BE AS SHOWN TO STOP WATER INGRESS Detail S Butt bottom fascia board against top fascia board as shown and secure in place using 4x S35 Detail S T Repeat for internal fascia boards and remaining ext...

Страница 29: ...ece along low side of roof Section 1 leaving sufficient overhang to fold down onto roof edge NOTE DO NOT FOLD UNDERNEATH ROOF Detail V1 V2 Once felt is rolled out fix to roof using CN13 at approx 100m...

Страница 30: ...n the roof panel and fascia board Secure using 2x N40 per barge board through purlins NOTE THERE ARE NO BARGEBOARDS SUPPLIED FOR LOW SIDE OF ROOF Secure finial over the top of the barge boards using 2...

Страница 31: ...31 Please retain instructions for future reference...

Страница 32: ...Display Agent Woodlands DIY Store Station Yard Horsforth Leeds LS18 5NZ Telephone 0113 205 4189 Website tigersheds com Email customersupport tigersheds com TIG INS38...

Отзывы: