![TierTime UP300 Скачать руководство пользователя страница 54](http://html1.mh-extra.com/html/tiertime/up300/up300_service-manual_1114576054.webp)
54
UP 300 Service Manual
Operation Guide 19- Method of replacing platform aluminum substrate
Tool
Cross screwdriver
1. Remove the breadboard.
2. Use a cross screwdriver to remove the screws that fasten the height aligning block.
3. Remove the FFC platform cable from the aluminum substrate interface (here you can also replace the FFC platform cable),
and then loosen the four leveling nuts to remove the aluminum substrate assembly.
4. Loosen the 6 screws that lock the aluminum substrate to the presser, and then replace the aluminum substrate.
Note: After the installation is complete, you need to adjust the level of the worktable by adjusting the 4 leveling
knobs.