13
Installation of ODU
The front and one side of the ODU are in open areas
Rear
Front
Rear
Rear
Front
Front
Rear
Rear
Rear
Front
Front
Front
3. Unit installation back to back
The front and one side of the ODU are in open areas
Rear
Front
Rear
Rear
Front
Front
Rear
Rear
Rear
Front
Front
Front
The unit is surrounded by walls
Rear
Front
Rear
Rear
Front
Front
Rear
Rear
Rear
Front
Front
Front
Содержание TIMS-X Series
Страница 1: ...INVERTER MULTI SYSTEM UNIT Applicable to TIMS X XA XT C series https tica pro...
Страница 27: ...27 Installation of Refrigerant Piping TBP4033TA TBP4072TA...
Страница 28: ...28 Installation of Refrigerant piping TBP4073TA Qty 2 Qty 2...
Страница 29: ...29 TBP4090TA...
Страница 30: ...30 TBP4135TA Qty 2 Qty 2...
Страница 57: ...141014 12 805 7 495 127 79 00 7 969 190 85 85 Email info tica pro...