
26
4. If steps 2 or 3 have been carried out, the loading position and magnetic absorption position of the stirring
sleeve must be checked as follows:
1) Take at least 4 deep-hole plates, place them at positions 1, 3, 4, 6 of the experiment module and correctly
place the stirring sleeve at columns 2 and 8;
2) Enter the debugging mode, select the horizontal pushing motor column, click the test button at the hole 2
position, and run the heating module to the corresponding position;
3) Select the lifting motor column, click the test button at the top of the stirring sleeve, and run to the
corresponding position;
4) Select the lifting motor column, click the test button at the loading stirring sleeve position to load the
stirring sleeve and check whether the buckle of the rotating sleeve is coincided with that of the stirring
sleeve. If not, slightly adjust the parameters at the loading position until they are coincided.
5) Select the lifting motor column, click “motor reset” at the bottom right corner to reset the rotating sleeve
frame. Then, select the magnetic absorption and module door motor column. Click the test button
behind the “Magnetic Bar Position during Magnetic Absorption”. Run the magnetic bar to the
corresponding position and slightly adjust the values. The magnetic bar shall be at the bottom of the
stirring sleeve (The magnetic bar shall be close to the stirring sleeve as far as possible, but they shall not
be in contact).
Adjust the parameters
until the rotating sleeve
buckle and stirring
sleeve are coincided
搅拌套卡扣
Rotating sleeve
buckle
Stirring sleeve buckle
Copyright @Tianlong Science
Copyright @Tianlong Science
Copyright @Tianlong Science
Copyright @Tianlong Science
Copyright @Tianlong Science
Copyright @Tianlong Science