Commissioning of the equipment
Commissioning of the equipment
Commissioning of the equipment
Commissioning of the equipment
Link Test
Link Test
Link Test
Link Test
Page
Page
Page
Page 5-2
5-2
5-2
5-2
25Jul00
25Jul00
25Jul00
25Jul00
being commissioned. If the automatic login fails a manual attempt
should be performed.
The TT-3022D Capsat Transceiver is now logged in and ready to
work.
5.3
Link Test
The Link Test consist of three parts:
Message Reception Test
Message Transmission Test and
Distress Test.
The TT-3022D will automatically perform a distress test without
any user intervention.
In the end of the test the Transceiver will receive the link test re-
sults.
5.4
Details of a Link Test
You should try to start one link test yourself to verify the unit.
After a while you will see a message on your screen and on your
printer saying:
----
Link Test started
and when the MAIL indicator on the TT-3022D front panel starts
flashing, the receive test has commenced.
A test message is then received from the LES by the Transceiver.
After the MAIL indicator has turned OFF, the transmission test be-
gins.
Содержание tt-3022d
Страница 4: ...This page is intentionally left blank ...