HOW TO CAUSE EXPENSIVE DAMAGE TO YOUR MACHINE

 

WHAT WAS DONE WRONG:  WHAT WAS THE RESULT OF THIS ACTION: 

Cracked and burnt high pressure seals in pump. 

Machine was allowed to run dry 
(without water supply) 

No. 1 piston cracked due to thermal shock. 

Mechanical damages to EVERYTHING: 

-          Pistol, HP hose, pump valves, pistons 

-          Crankshaft bearing failure 

-          Pressure gauge failure 

-          By-pass valve excessive wear & tear 

-          Frequent O-rings blow outs 

Unit was run on low volume 
water supply and allowed to 
cavitate 

-          Brass heads deformed 

Over adjust by-pass valve to try 
and increase PSI 

Dump pressure was too high. Hydraulic hammer to system every 
time trigger is closed. PSI was increased 5-fold normal working 
pressure. 

Excessive wear & tear on pistons / valves / seals / HP jets. 

Excessive blocking of filters caused by bore or recycled water with 
high salt / mineral content. Pump clogged up with debris. 

In-Line filter was removed 
because “It kept blocking up!” 

Remember: Spec requirement says: “Potable water” 

Over-revved engine for more PSI 

Engine & Pump premature wear & tear. (Most increased PSI  
pressure is lost through by-pass valve and only small increase in 
pressure is achieved doing this!) Lost of waster horse power! 

When orifice is reduced, the PSI will rise and then by-pass valve will 
dump (thinking the pistol is shut). Most extra PSI will be dumped and 
only a slight increase in PSI will be achieved. 

COMMON MISTAKE:

 Put a 

smaller HP Jet onto lance for 
higher pressure.

 

Engine, By-pass valve & Pump premature wear & tear.   

Using Contaminated Fuel (“Had 
to remove fuel filter to keep 
engine running!”) 

Excess Fuel-system clean-outs required. If excessive corrosion in 
carburetor or injectors is detected after the 2nd or 3rd in-line fuel 
filter replacement, then this should ring alarm bells. 

Park machine where debris 
blows all over it. Reverse 
bulldozer over it. 

Our machines are rugged and strong – but not battle tanks! 

Hire units long-terms and fluid 
levels are not checked. 

Con-rod through the crank case! 

Modify 240 Volt electric unit to 
override thermal overload on 
motor. 

Stop-Start capacitors melted. 

Used 100m extension lead and a 
5 Kva Gen-Set. 

A 10% low current is equivalent to a 50% over-load. 

  

Our 3 hp 240 Volt motors require 8 Kva Gen-Set minimum! 

Run trucks, fork-lifts, tracked 
excavation equipment over 
hoses and lance 
assemblies/pressure guns. 

Needs replacing of damaged parts 

Содержание E15i-43C

Страница 1: ...4 Operating Tips Shutting down Regular Checks 5 Maintenance Schedule 6 7 Trouble Shooting Guide 8 What can cause expensive damage to your machine 9 WARNINGS SAFETY INSTRUCTIONS 10 MEDIC ALERT Informa...

Страница 2: ...18 lpm Set up de rated pressure flow 1100 psi 11 lpm 1100 psi 11 lpm 3000 psi 18 lpm 4000 psi possible 3000 psi 18 lpm 4000 psi possible Nozzle size at set up pressure 15060 15060 15060 15060 Pump Sp...

Страница 3: ...t pump flow rate litres per minute Turn on the water supply open tap fully Water will fill the break tank if fitted Unroll the hose fully ensuring there are no kinks in it Trigger gun to expel any air...

Страница 4: ...operating pressure If pressure drops over time it may indicate general wear and tear and a service is recommended Air Leaks Especially in suction to pump hoses Repair immediately if found Check for cu...

Страница 5: ...t Tag electrical equipment as Specified by Law As required by law 12 CONTROL PANEL Have an Authorised Electrician Fully Function Test Repair or Replace all Electrical Components As required or annuall...

Страница 6: ...system Check suction hose Increase diameter size for bigger supply Damaged ceramic plunger Replace Plunger SHORT PLUNGER SEAL LIFE Excessive pressure and or temp in the pumped water Check the tempera...

Страница 7: ...ton Check Replace OIL IN PUMP EMULSIFIED CONTAMINATED BY WATER water in the oil Water Blasted into Pump via Breather Cap during Cleaning Exercise Care H P Piston Seals Worn or Check and Replace Seal P...

Страница 8: ...ost through by pass valve and only small increase in pressure is achieved doing this Lost of waster horse power When orifice is reduced the PSI will rise and then by pass valve will dump thinking the...

Страница 9: ...enetration would be detrimental NEVER WATER BLAST fragile items surfaces that may be damaged by high velocity water Always carefully test on a small area first ALWAYS WEAR PROTECTIVE GEAR PPE i e Head...

Страница 10: ...pecial note of any chemicals that were used and the quality of the water MEDIC ALERT INFORMATION ALWAYS ENSURE MACHINE IS FITTED WITH A REMOVEABLE MEDICAL ALERT WARNING TAG AND TAKE THIS TO A MEDICAL...

Страница 11: ...able loss or damage You are also entitled to have the goods repaired or replaced if goods fail to be of acceptable quality and the failure does not amount to a major failure The benefits to the consum...

Страница 12: ...y period THIS WARRANTY WILL NOT APPLY TO Any part component that has been subject to misuse negligence accidental damage improper or inadequate maintenance or improper storage Any part that has been s...

Страница 13: ...n the required flow of the pressure pump specification and suitable power supply outlet for electrical units where applicable 8 No responsibility will be taken for late delivery day due to unforeseen...

Страница 14: ...3 6 6 10 8 GPM 0 3000 PSI Features all stainless and brass internal parts New design reduces sensitivity to entrapped air No external moving parts or springs Unique barb and flow balance design provid...

Страница 15: ...3 15 16 22 24 25 28 29 INSTALLATION Select an unloader appropriate for the pressure and flow of your system see specification chart This unloading valve is a flow through design and should be mounted...

Страница 16: ......

Страница 17: ......

Страница 18: ...lvola 6 23 0900 30 Valve spring Molla valvola 6 24 0604 10 Valve cage Gabbia valvola 6 25 1801 12 Screw Vite M6x16 12 26 0203 18 Bearing cover Coperchio cuscinetto 2 27 0205 02 Bearing seal Cappellott...

Страница 19: ...istone 18 1 2600 43 Complete seal Packing 18 mm 2600 43 Pacco completo Guarnizioni pistone 18 3 2614 05 Plunger 18 mm 2614 05 Pistone 18 3 2600 28 Complete Valve 2600 28 Valvola completa 1 2608 26 Plu...

Страница 20: ...0 0 0 03 3 3 36 6 6 6 0 0 0 0 0 0 0 00 0 0 00 0 0 0 2 2 2 2 8 8 8 8 5 5 5 50 0 0 0 2 2 2 2 XLT3816S 160 2320 38 46 10 12 1000 1200 15 9 19 0 11 7 14 0 XLT5015 150 2175 50 60 13 2 15 8 1450 1740 18 8 2...

Страница 21: ...LT3816S XLT1830 XLT2230 XLT2530 XLT2520 XLT2730 XLT3025 XLT3020 XLT3325 XLT3517 XLT4017 XLT4014 XLT4317 XLT5015 XLT5415 23 24 25 26 27 28 29 30 27 31 26 32 33 24 23 34 35 36 37 38 39 40 41 42 43 44 45...

Страница 22: ...3 2601 14 Complete seal Packing 25 mm 3 2601 16 Complete seal Packing 28 mm 3 2601 30 Plunger 20 mm 3 2601 29 Plunger 22 mm 3 2601 17 Plunger 25 mm 3 2601 18 Plunger 28 mm 3 2600 10 Complete Valve 6 2...

Страница 23: ...65 U seal dia 28 mm 3 8 1601 33 Brass plug G3 4 1 9 0603 11 Copper washer 3 4 1 1602 39 Manifold housing 28 25 1 1602 40 Manifold housing 22 20 1 0601 66 O Ring 2 62x25 7 6 0601 18 O Ring 2 62x21 89...

Страница 24: ...Bonded seal 3 1200 32 Plunger 20 mm 3 1200 34 Plunger 22 mm 3 1200 33 Plunger 25 mm 3 1200 30 Plunger 28 mm 3 37 1400 57 Copper spacer 3 38 0003 32 Plunger rod 3 39 1502 07 Connecting rod pin 3 40 010...

Страница 25: ...1 1 2 2 3 3 4 4 5 5 6 6 A A B B C C D D E3R 22C Circuit Diagram A Ferero 3 11 2011 Designed by Checked by Approved by Date 1 1 Edition Sheet Date M...

Страница 26: ...2 2 3 3 4 4 5 5 6 6 A A B B C C D D E15I Circuit Diagram A Ferero D Cover 22 11 2011 Designed by Checked by Approved by Date 1 1 Edition Sheet Date L1 L2 L3 30 VA 415 240 2A C1 EOL M EOL STOP START C1...

Страница 27: ...12 Designed by Checked by Approved by Date 1 1 Edition Sheet Date 1 2 3 415V 24V 2A EOL R1 STOP START C1 C1 R1 4 5 C1 EOL M 1 2 3 Supply 4 5 Water shutdown Instant 6 7 Timed shutdown set to OP T1 T1 6...

Отзывы: