In  order  to  ensure  the  required  return  water  temperature  the  following 
solutions are suggested: 

  Higher settings on the boiler (possible only with low external temperatures). 

Recommended 

  use of a mixing system based on the application of a three-way mixing valve 

with a boiler circulator (the solution ensuring the proper temperature of both 
the return water and the central heating system) 

Boiler water requirements: 

  water  for  filling  up  boilers  and  heating  installations  should  comply  with  the 

requirements of the PN-93/C-04607 standard, 

  the boiler water should have the following parameters: 

-  pH value > 8.5 

-  total hardness < 20of 

-  free oxygen content < 0,05 mg/l 

-  chlorides content < 60 mg/l. 

  the  used  water  treatment  technology  for  filling  up  the  heating  installation 

should comply with the requirements referred to above, 

  In  the  event  of  failing  to  comply  with  the  above-mentioned  requirements, 

THERMOSTAHL may withdraw the guarantee for the installed boiler (boilers). 

4.6. Chimney system 

  It  should be  installed  as  an  acid-proof,  double-wall,  insulated  chimney,  or  in 

the  case  of  chimneys  made  of  brick,  comply  with  the  requirements  of  the 
PN89/B-10425  standard;  the  technical  parameters  of  the  chimney  should 
ensure  its  protection  against  the  effects  of  the  condensate  resulting  from 
cooling of the flue gas. Use of acid-proof chimney inserts (tin, stoneware, etc.) 
is recommended. 

  The section of the chimney can be calculated following the formula provided 

below:  

D = 20(3+P)

1/2

 [m

2

]

; where: D-diameter in mm, P-boiler power rating in kW. 

 

The chimney diameter may not be less than the diameter of the flue. 

  Connecting several boilers to one common chimney flue is not recommended. 

  The connection of the boiler to the chimney should be thermally insulated and 

run the shortest possible way with the least possible number of pipe elbows, 
with the appropriate height of the flue towards the chimney. 

  The  chimney  should  be  freely  open  towards  the  top  and  built  at  least  1  m 

above the roof, 

  The  diameter  of  the  flue  gas  duct  should  be  selected  (calculated)  in 

accordance  with  the  recommendations  of  the  manufacturers  of  the  chimney 
inserts, however it should not be less than the diameter of the boiler flue. 

  Installation of an inspection door for removing combustion residues should be 

envisaged, 

  The entire length of the chimney should be maintained clean, 

Содержание PYROGAS 116

Страница 1: ...Gasification boiler PYROGAS INSTRUCTION MANUAL ver 1 1...

Страница 2: ...improper installation of the device and for failure to comply with the terms and conditions set forth in the Operation and Maintenance Documentation 2 SCOPE OF DELIVERY SHIPPING CONDITION PYROGAS boil...

Страница 3: ...e paths into the smoke chamber and subsequently to the chimney An air fan is equipped at the front side of boiler and supplies with primary and secondary air the upper chamber and the area around the...

Страница 4: ...ts the feeding chamber with the smoke chamber That helps the exhausts to leave from the feeding chamber to the chimney and not to the boiler room during the start of boiler and during the feeding proc...

Страница 5: ...470 PYROGAS 47 40 47 3 172 3 62 436 176 570 PYROGAS 58 50 58 3 191 3 93 482 201 670 PYROGAS 69 60 76 3 210 4 24 527 226 770 PYROGAS 81 70 81 3 238 5 27 581 251 870 PYROGAS 93 80 93 3 257 5 58 656 276...

Страница 6: ...d briquettes 5 2 10 4 ATTENTION Do not use inappropriate fuels There is danger for the health and for the boiler Do not as fuels woods that contain chemicals or explosive materials MDF household waste...

Страница 7: ...f the boiler room should comply with the requirements relating to heat loads fire protection regulations and allow for them to be fitted out operated and maintained in compliance with the OHS regulati...

Страница 8: ...ning outside under pressure with the clear width of min 0 9 m 4 3 Hydraulic system installation The system should be installed in accordance with the applicable regulations and best construction pract...

Страница 9: ...y valve 19 20 21 22 23 24 Check valve Buffer tank VE Open type expansion tank PCI Circulator of heating system PRC Recirculation pump PB Circulator for buffer tank RP Pressure reducer F Y type straine...

Страница 10: ...C Recirculation pump PB Buffer tank circulator RP Pressure reducer F Y type strainer A Automatic air vent FD Water filter 4 4 Installation safety 3 bar safety kit It consists of a collector manometer...

Страница 11: ...wo ports which makes it easy to install and does not require any balancing valve in the bypass pipe The LTC100 has an integrated auto circulation function which makes the unit operational even during...

Страница 12: ...with the drain for the disposal of the overheated water The T P valve should be connected nearby to the boiler and necessary at the outlet It provides safety in case of closed type expansion tank ins...

Страница 13: ...of chimneys made of brick comply with the requirements of the PN89 B 10425 standard the technical parameters of the chimney should ensure its protection against the effects of the condensate resultin...

Страница 14: ...mney the user should obtain a positive opinion of the chimney cleaners specialist A graph for selecting the chimney diameter in relation to the boiler power rating and the chimney height including the...

Страница 15: ...ate 04 TEMP Bypass Water temperature that the bypass valve starts to operate 05 FAN AIR MAX Maximum power amount of the fan in the full burning process 06 DT WATER Temperature difference below the max...

Страница 16: ...on process The water is evaporated during operation of the boiler But at the first operations the boiler should not be working at full load because the water content can be vaporized and create gaps i...

Страница 17: ...condition and functioning properly The boiler should be cleaned daily by the combustion residues ash and unburned residues Clean both upper chamber and combustion chamber Clean walls and ceramic plate...

Страница 18: ...the boiler despite intensive burning 1 Improper fuel too low calorific value or damp fuel 2 Incorrectly selected boiler in relation to the size of the building 3 No weak chimney draught 4 Incorrect a...

Страница 19: ...of the boiler 2 Very low return temperature 3 Fuel with very high amount of moisture 4 Low chimney draft 5 Small section of chimney 6 Faulty connection to the chimney 7 Concentrates or rain entering...