and  its  operation  is  complete  mechanic  without  electric  or  spare  parts.  After  the 
decrease  of  boiler  temperature  under  a  limit  the  valve  closes  again  and  the  water 
stops to come into the serpentine.  

If the web pressure is over 6 bar it is necessary to install a pressure reducer before 
the  installation.  Noted  that  this  valve  does  not  replace  the  safety  valve  and  it  is 
important to install safety valves too (at least 2).  

 

–

 

Temperature and pressure relief valve 

The  T&P  valve  has  a  temperature  sensor  and  provides  double  safety  against 
temperature  (90

o

C)  and  pressure  (3  bar).  The  output  of  the  valve  should  be 

connected  with  the  drain  for  the  disposal  of  the  overheated  water.  The  T&P  valve 
should  be  connected  nearby  to  the  boiler  and  necessary  at  the  outlet.  It  provides 
safety  in  case  of  closed  type  expansion  tank  installation  but  it  is  not  replace  the 
overheating safety system. 

Technical data: 

 

Temperature (limit) 

90

ο

Pressure (limit) 

3 bar 

Connection 

½”

 

Discharge rating: 

10 kW 

 

Dimensions 

½”

 

Ø15

 

40 

102 

88 

39 

 

 

 

4.5. Thermal protection of the boiler 

  The boiler should be operated within the supply and return water temperature 

differences in the range of 10 

 

15°C.

 

Because  of  the  lifecycle  of  the  boiler,  it  should  be  operated  with  the  return 
water temperature not 

lower  than  60°C.

 

In  practice,  it  is  difficult  to  meet  this  condition  because  the  average 

atmospheric   conditions   during   the   entire   heating   season   “require”   lower  

settings. 

Содержание PYROGAS 116

Страница 1: ...Gasification boiler PYROGAS INSTRUCTION MANUAL ver 1 1...

Страница 2: ...improper installation of the device and for failure to comply with the terms and conditions set forth in the Operation and Maintenance Documentation 2 SCOPE OF DELIVERY SHIPPING CONDITION PYROGAS boil...

Страница 3: ...e paths into the smoke chamber and subsequently to the chimney An air fan is equipped at the front side of boiler and supplies with primary and secondary air the upper chamber and the area around the...

Страница 4: ...ts the feeding chamber with the smoke chamber That helps the exhausts to leave from the feeding chamber to the chimney and not to the boiler room during the start of boiler and during the feeding proc...

Страница 5: ...470 PYROGAS 47 40 47 3 172 3 62 436 176 570 PYROGAS 58 50 58 3 191 3 93 482 201 670 PYROGAS 69 60 76 3 210 4 24 527 226 770 PYROGAS 81 70 81 3 238 5 27 581 251 870 PYROGAS 93 80 93 3 257 5 58 656 276...

Страница 6: ...d briquettes 5 2 10 4 ATTENTION Do not use inappropriate fuels There is danger for the health and for the boiler Do not as fuels woods that contain chemicals or explosive materials MDF household waste...

Страница 7: ...f the boiler room should comply with the requirements relating to heat loads fire protection regulations and allow for them to be fitted out operated and maintained in compliance with the OHS regulati...

Страница 8: ...ning outside under pressure with the clear width of min 0 9 m 4 3 Hydraulic system installation The system should be installed in accordance with the applicable regulations and best construction pract...

Страница 9: ...y valve 19 20 21 22 23 24 Check valve Buffer tank VE Open type expansion tank PCI Circulator of heating system PRC Recirculation pump PB Circulator for buffer tank RP Pressure reducer F Y type straine...

Страница 10: ...C Recirculation pump PB Buffer tank circulator RP Pressure reducer F Y type strainer A Automatic air vent FD Water filter 4 4 Installation safety 3 bar safety kit It consists of a collector manometer...

Страница 11: ...wo ports which makes it easy to install and does not require any balancing valve in the bypass pipe The LTC100 has an integrated auto circulation function which makes the unit operational even during...

Страница 12: ...with the drain for the disposal of the overheated water The T P valve should be connected nearby to the boiler and necessary at the outlet It provides safety in case of closed type expansion tank ins...

Страница 13: ...of chimneys made of brick comply with the requirements of the PN89 B 10425 standard the technical parameters of the chimney should ensure its protection against the effects of the condensate resultin...

Страница 14: ...mney the user should obtain a positive opinion of the chimney cleaners specialist A graph for selecting the chimney diameter in relation to the boiler power rating and the chimney height including the...

Страница 15: ...ate 04 TEMP Bypass Water temperature that the bypass valve starts to operate 05 FAN AIR MAX Maximum power amount of the fan in the full burning process 06 DT WATER Temperature difference below the max...

Страница 16: ...on process The water is evaporated during operation of the boiler But at the first operations the boiler should not be working at full load because the water content can be vaporized and create gaps i...

Страница 17: ...condition and functioning properly The boiler should be cleaned daily by the combustion residues ash and unburned residues Clean both upper chamber and combustion chamber Clean walls and ceramic plate...

Страница 18: ...the boiler despite intensive burning 1 Improper fuel too low calorific value or damp fuel 2 Incorrectly selected boiler in relation to the size of the building 3 No weak chimney draught 4 Incorrect a...

Страница 19: ...of the boiler 2 Very low return temperature 3 Fuel with very high amount of moisture 4 Low chimney draft 5 Small section of chimney 6 Faulty connection to the chimney 7 Concentrates or rain entering...

Отзывы: